Inspection and Verification
- Verify the customer concern by operating the system.
- Visually inspect for obvious signs of mechanical or electrical damage.VISUAL INSPECTION CHART
Mechanical Electrical - Roof opening panel
- Roof opening panel frame
- Roof opening panel drain hoses
- Roof opening panel lifter assemblies
- Roof opening panel trough
- Roof opening panel air deflector assembly
- Roof opening panel seal
- Roof opening panel shield
- Battery Junction Box (BJB) fuse 33 (20A)
- Smart Junction Box (SJB) fuse 41 (15A)
- Circuitry
- Accessory delay relay
- Roof opening panel motor and module assembly
- Roof opening panel switch
- If an obvious cause for an observed or reported concern is found, correct the cause (if possible) before proceeding to the next step.
- If the concern is not visually evident, determine the symptom. GO to Symptom Chart - Roof Opening Panel or Symptom Chart - NVH .