Installation [11/2021 - 03/2024]: Procedure
- INSTALL OIL PUMP WITH MOTOR ASSEMBLY
Torque: 46 N.m (469 kgf/cm, 34 ft.lbf)
- INSTALL WIRE HARNESS CLAMP BRACKET
Torque: 20 N.m (204 kgf/cm, 15 ft.lbf)
- CONNECT NO. 2 TRANSMISSION OIL COOLER HOSE ASSEMBLY
*a 0 to 3 mm (0 to 0.118 in.) *b 2 to 7 mm (0.0787 to 0.276 in.) *c Paint Mark *d Marking *e Center of Paint Mark *f 45° (Claw of Clip Location) - Connect the No. 2 transmission oil cooler hose assembly to the oil pump with motor assembly and slide the 2 clips to secure it.NOTE:
- Make sure to slide the No. 2 transmission oil cooler hose assembly until it contacts the hose stopper of the oil pump with motor assembly.
- Make sure to align the paint mark on each No. 2 transmission oil cooler hose assembly with each marking on the oil pump with motor assembly.
- Make sure that the claws of the clip are within the location shown in the illustration.
- Connect the No. 2 transmission oil cooler hose assembly to the oil pump with motor assembly and slide the 2 clips to secure it.
- INSTALL INTAKE MANIFOLD
Refer to INSTALLATION [11/2021 - ]
- INSPECT HYBRID TRANSAXLE FLUID
See step 2
- INSPECT FOR HYBRID TRANSAXLE FLUID LEAK
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 67
- INSTALL NO. 1 ENGINE UNDER COVER
Refer to PROCEDURE - Step 68
- INSTALL FRONT FENDER FRONT SPLASH SHIELD RH
- INSTALL FRONT FENDER FRONT SPLASH SHIELD LH