LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2025 >> NX 350h >> Repair and Diagnosis >> External Pages >> Different car >> Section 38 (Engine Control System - Service Information) >> Relay >> On-Vehicle Inspection [11/2021 - ] >> Procedure

On-Vehicle Inspection [11/2021 - ]: Procedure

WARNING: This page is about a different car, the 2025 Lexus NX 250, 2024 Lexus NX 250, 2023 Lexus NX 250, and 2022 Lexus NX 250. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSPECT INJECTOR RELAY (D INJ) 
    1. Measure the resistance according to the value(s) in the table below.
      GTY751946Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard Resistance

      Tester Connection Condition Specified Condition
      3 - 5 Battery voltage not applied between terminals 1 and 2 10 kΩ or higher
      Battery voltage applied between terminals 1 and 2 Below 1 Ω

      If the result is not as specified, replace the injector relay (D INJ).

  2. INSPECT VVT RELAY (VVT) 
    1. Measure the resistance according to the value(s) in the table below.
      GTY751946Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard Resistance

      Tester Connection Condition Specified Condition
      3 - 5 Battery voltage not applied between terminals 1 and 2 10 kΩ or higher
      Battery voltage applied between terminals 1 and 2 Below 1 Ω

      If the result is not as specified, replace the VVT relay (VVT).

  3. INSPECT NO. 1 ELECTRONIC FUEL INJECTION MAIN RELAY (EFI-MAIN NO. 1) 
    1. Measure the resistance according to the value(s) in the table below.
      GTY751946Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard Resistance

      Tester Connection Condition Specified Condition
      3 - 5 Battery voltage not applied between terminals 1 and 2 10 kΩ or higher
      Battery voltage applied between terminals 1 and 2 Below 1 Ω

      If the result is not as specified, replace the No. 1 electronic fuel injection main relay (EFI-MAIN NO. 1).

  4. INSPECT NO. 2 ELECTRONIC FUEL INJECTION MAIN RELAY (EFI-MAIN NO. 2) 
    1. Measure the resistance according to the value(s) in the table below.
      GTY751946Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard Resistance

      Tester Connection Condition Specified Condition
      3 - 5 Battery voltage not applied between terminals 1 and 2 10 kΩ or higher
      Battery voltage applied between terminals 1 and 2 Below 1 Ω

      If the result is not as specified, replace the No. 2 electronic fuel injection main relay (EFI-MAIN NO. 2).

  5. INSPECT NO. 3 ELECTRONIC FUEL INJECTION MAIN RELAY (EFI-MAIN NO. 3) 
    1. Measure the resistance according to the value(s) in the table below.
      GTY751946Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard Resistance

      Tester Connection Condition Specified Condition
      3 - 5 Battery voltage not applied between terminals 1 and 2 10 kΩ or higher
      Battery voltage applied between terminals 1 and 2 Below 1 Ω

      If the result is not as specified, replace the No. 3 electronic fuel injection main relay (EFI-MAIN NO. 3).

  6. INSPECT IGP RELAY (IGP NO. 1) 
    1. Measure the resistance according to the value(s) in the table below.
      GTY751946Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard Resistance

      Tester Connection Condition Specified Condition
      3 - 5 Battery voltage not applied between terminals 1 and 2 10 kΩ or higher
      Battery voltage applied between terminals 1 and 2 Below 1 Ω

      If the result is not as specified, replace the IGP relay (IGP NO. 1).