Caution / Notice / Hint
WARNING: This page is about a different car, the 2025 Lexus NX 250, 2024 Lexus NX 250, 2023 Lexus NX 250, and 2022 Lexus NX 250. However, it is still accessible from the selected car via links, so may be relevant.
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during mass air flow meter sub-assembly removal/installation are shown below.
NECESSARY PROCEDURES AFTER PARTS REMOVED/INSTALLED/REPLACED
| Replaced Part or Performed Procedure | Necessary Procedure | Effect/Inoperative Function when Necessary Procedure not Performed | Link |
|---|---|---|---|
| Replacement of mass air flow meter sub-assembly | Inspection after repair |
|
Refer to INITIALIZATION [11/2021 - ] |
COMPONENTS (REMOVAL)
| Callout - Procedure | Part Name Code | ||||
|---|---|---|---|---|---|
| 1 | MASS AIR FLOW METER SUB-ASSEMBLY | 22204 | See step 1 | - | - |