On-Vehicle Inspection [11/2021 - ]: Procedure
WARNING: This page is about a different car, the 2025 Lexus NX 250, 2024 Lexus NX 250, 2023 Lexus NX 250, and 2022 Lexus NX 250. However, it is still accessible from the selected car via links, so may be relevant.
- REMOVE NO. 2 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 1
- INSPECT REAR ENGINE MOUNTING INSULATOR
- Disengage the 2 clamps to separate the vacuum hose.
- Disconnect the vacuum hose.
- Using a vacuum pump, apply vacuum of 80 kPa (600 mmHg, 23.6 in.Hg) and wait for 1 minute.
- Check that there is no change in the needle movement of the vacuum pump gauge.
OK
Vacuum pressure holds.
- Check that there is no fluid leakage caused by a break in the diaphragm.
- Connect the vacuum hose.
- Engage the 2 clamps to install the vacuum hose.
- Disengage the 2 clamps to separate the vacuum hose.
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 6