DTC P058A-01: Battery Monitor Module General Electrical Failure [03/2023 - ]: Procedure
WARNING: This page is about a different car, the 2025 Lexus NX 250, 2024 Lexus NX 250, 2023 Lexus NX 250, and 2022 Lexus NX 250. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK BATTERY STATE SENSOR ASSEMBLY INSTALLATION CONDITION
Result:
NG
INSTALL THE BATTERY STATE SENSOR ASSEMBLY CORRECTLY. Refer to INSTALLATION [11/2021 - ]
Result:
OK
See step 2
- CHECK CHARGING SYSTEM
Refer to ON-VEHICLE INSPECTION [11/2021 - ]
Result
Proceed to OK NG Result:
NG
REPAIR OR REPLACE CHARGING SYSTEM
Result:
OK
See step 3
- CHECK HARNESS AND CONNECTOR (POWER SOURCE CIRCUIT)
- Disconnect the battery state sensor assembly connector.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition A45-1 (RBAT) - Body ground Always 11 to 14 V A45-3 (+B) - Body ground Always 11 to 14 V Result
Proceed to OK NG
Result:
OK
REPLACE BATTERY STATE SENSOR ASSEMBLY. Refer to REMOVAL [11/2021 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR