Installation [03/2022 - ]: Procedure
- INSTALL CAMSHAFT
*1 No. 1 Valve Rocker Arm Sub-assembly *2 Valve Lash Adjuster Assembly *3 Valve Stem Cap - - *a "0" Timing Mark *b Timing Mark - Turn the crankshaft clockwise to align the timing mark (cutout) on the crankshaft pulley assembly with the "0" timing mark on the No. 2 timing chain cover assembly.
- Check that the No. 1 valve rocker arm sub-assembly is correctly installed as shown in the illustration.
- Clean the camshaft housing sub-assembly and the cams and journals of the camshaft and No. 2 camshaft, and then apply engine oil to them.
- Apply a light coat of engine oil to the journals of the camshaft and install the camshaft to the camshaft housing sub-assembly.
- Apply a light coat of engine oil to the journals of the No. 2 camshaft and install the No. 2 camshaft to the camshaft housing sub-assembly.
*1 No. 1 Camshaft Bearing Cap *2 No. 2 Camshaft Bearing Cap *3 No. 3 Camshaft Bearing Cap *4 No. 4 Camshaft Bearing Cap - Set the No. 1 camshaft bearing cap, No. 2 camshaft bearing cap, 2 No. 3 camshaft bearing caps and No. 4 camshaft bearing cap as shown in the illustration.
- Uniformly tighten the 14 bolts in the order shown in the illustration.
Torque: 28.5 N.m (291 kgf/cm, 21 ft.lbf)
- Uniformly tighten the 8 bolts in the order shown in the illustration.
Torque: 16 N.m (163 kgf/cm, 12 ft.lbf)
*a Paint Mark *b Timing Mark *c Knock Pin - - - Set the camshaft timing gear assembly and camshaft timing exhaust gear assembly to the chain sub-assembly as shown in the illustration.
- Align the timing mark on the camshaft timing gear assembly with the paint mark on the chain sub-assembly.
- Align the timing mark on the camshaft timing exhaust gear assembly with the paint mark on the chain sub-assembly.
- Using the hexagonal portion of the camshaft, install the camshaft timing gear assembly to the camshaft.NOTE:
Do not damage the camshaft housing sub-assembly, cylinder head sub-assembly and spark plug tube.
- Check that the knock pin matches the pin hole from the No. 2 timing chain cover assembly side.
- Using a 10 mm bi-hexagon socket wrench, temporarily install the camshaft timing gear assembly with the bolt.
- Using the hexagonal portion of the No. 2 camshaft, install the camshaft timing exhaust gear assembly to the No. 2 camshaft.NOTE:
Do not damage the camshaft housing sub-assembly, cylinder head sub-assembly and spark plug tube.
- Temporarily install the 2 bolts.
HINT:
The 2 bolts can only be installed as shown in the illustration if the knock pin on the No. 2 camshaft and the pin hole on the camshaft timing exhaust gear assembly match. If the 2 bolts cannot be installed, the knock pin and pin hole do not match.
*1 No. 1 Chain Vibration Damper *2 Chain Tensioner Slipper - Check the status of the camshaft timing gear assembly and camshaft timing exhaust gear assembly temporarily installed to each camshaft.
1. Camshaft timing gear assembly side:
Check that the chain sub-assembly does not overlap the No. 1 chain vibration damper as shown in the illustration.
NOTE:If the chain sub-assembly overlaps the No. 1 chain vibration damper, install it again.
2. Camshaft timing exhaust gear assembly side:
Check that the chain sub-assembly does not overlap the chain tensioner slipper as shown in the illustration.
NOTE:If the chain sub-assembly overlaps the chain tensioner slipper, install it again.
- Check the status of the camshaft timing gear assembly and camshaft timing exhaust gear assembly temporarily installed to each camshaft.
*a Paint Mark *b Timing Mark *c Hold *d Torque Wrench Fulcrum Length *e Turn - - - Using the hexagonal portion of the camshaft, hold the camshaft.NOTE:
- Do not damage the camshaft housing sub-assembly, cylinder head sub-assembly and spark plug tube.
- Do not disassemble the camshaft timing gear assembly.
- Using SST and a 10 mm bi-hexagon socket wrench, tighten the bolt on the camshaft timing gear assembly.
- SST: 09961-01270
Specified tightening torque
Torque: 86 N.m (877 kgf/cm, 63 ft.lbf)
HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Refer to PRECAUTION [11/2021 - ]
- When using SST (fulcrum length of 200 mm (7.87 in.)) + torque wrench (fulcrum length of 255 mm (10 in.)): 48 N.m (489 kgf/cm, 35 ft.lbf)
- Using the hexagonal portion of the No. 2 camshaft, hold the No. 2 camshaft.NOTE:
Do not damage the camshaft housing sub-assembly, cylinder head sub-assembly and spark plug tube.
- Using a 5 mm hexagon socket wrench, tighten the 2 bolts.
Torque: 19 N.m (194 kgf/cm, 14 ft.lbf)
- Check that the paint marks and timing marks are positioned as shown in the illustration.
- Using the hexagonal portion of the camshaft, hold the camshaft.
*a Hold *b Pin Turn - - - Using the hexagonal portion of the camshaft, check that the chain sub-assembly slackens when the camshaft is moved in the direction shown in the illustration.NOTE:
If the chain sub-assembly remains tight and does not slacken, the chain tensioner slipper and No. 1 chain vibration damper may overlap the chain sub-assembly, so install them again.
- Remove the pin from the No. 1 chain tensioner assembly.
- Using the hexagonal portion of the camshaft, check that the chain sub-assembly slackens when the camshaft is moved in the direction shown in the illustration.
- Perform "Inspection After Repair" after replacing the camshaft, No. 2 camshaft, camshaft timing gear assembly and camshaft timing exhaust gear assembly.
Refer to INITIALIZATION [11/2021 - ]
- INSTALL STRAIGHT SCREW PLUG
Refer to PROCEDURE - Step 5 - SET NO. 1 CYLINDER TO TDC (COMPRESSION)
See step 17 - INSTALL FUEL PUMP LIFTER GUIDE
Refer to PROCEDURE - Step 30 - INSTALL SPARK PLUG TUBE GASKET
Refer to PROCEDURE - Step 46 - INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 47 - INSTALL CAM TIMING CONTROL MOTOR O-RING
Refer to PROCEDURE - Step 1 - INSTALL CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY
Refer to PROCEDURE - Step 2 - INSTALL CAMSHAFT TIMING VALVE ASSEMBLY
Refer to PROCEDURE - Step 1 - INSTALL CAM TIMING OIL CONTROL SOLENOID O-RING
Refer to PROCEDURE - Step 1 - INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY
Refer to PROCEDURE - Step 2 - CONNECT NO. 2 EARTH WIRE
Refer to PROCEDURE - Step 5
- INSTALL IGNITION COIL ASSEMBLY
Refer to PROCEDURE - Step 2 - INSTALL VACUUM PUMP ASSEMBLY
Refer to INSTALLATION [11/2021 - ]
- INSTALL ENGINE WIRE
- INSTALL NO. 2 ENGINE COVER
Refer to PROCEDURE - Step 62
- INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY
Refer to INSTALLATION [11/2021 - ]