Installation [11/2021 - ]: Procedure
- INSTALL WIRE HARNESS CLAMP BRACKET
- Using an 8 mm socket wrench, install the wire harness clamp bracket to the No. 2 timing chain cover assembly with the bolt.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Using an 8 mm socket wrench, install the wire harness clamp bracket to the crankshaft bearing cap with the bolt.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Using an 8 mm socket wrench, install the wire harness clamp bracket to the No. 2 timing chain cover assembly with the bolt.
- INSTALL CRANKSHAFT POSITION SENSOR
Refer to PROCEDURE - Step 1 - INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
Refer to PROCEDURE - Step 1 - INSTALL KNOCK CONTROL SENSOR
Refer to PROCEDURE - Step 1 - INSTALL ENGINE COOLANT TEMPERATURE SENSOR (for Cylinder Head Side)
Refer to PROCEDURE - Step 1 - INSTALL HEATER WATER HOSE BRACKET
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- INSTALL WATER BY-PASS GASKET
- INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- INSTALL WATER BY-PASS HOSE
- INSTALL EXHAUST PIPE HEAT INSULATOR
Refer to PROCEDURE - Step 5 - INSTALL NO. 2 MANIFOLD STAY
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- INSTALL WATER INLET HOUSING
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- INSTALL WIRE HARNESS
- INSTALL IGNITION COIL ASSEMBLY
Refer to PROCEDURE - Step 2 [11/2021 - 03/2023] , or refer to PROCEDURE - Step 2 [03/2023 - ] - INSTALL PORT FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 1 [11/2021 - 03/2023] , or refer to PROCEDURE - Step 1 [03/2023 - ] - INSTALL NO. 5 ENGINE WIRE
- INSTALL INJECTOR VIBRATION INSULATOR
- INSTALL FUEL DELIVERY SPACER
- INSTALL FUEL DELIVERY PIPE
Refer to PROCEDURE - Step 5 [11/2021 - 03/2023] , or refer to PROCEDURE - Step 5 [03/2023 - ] - INSTALL NO. 2 WATER BY-PASS PIPE
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- INSTALL FUEL PUMP LIFTER ASSEMBLY
Refer to PROCEDURE - Step 1 [11/2021 - 03/2023] , or refer to PROCEDURE - Step 1 [03/2023 - ] - INSTALL FUEL PUMP SPACER GASKET
- TEMPORARILY INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY
Refer to PROCEDURE - Step 3 [11/2021 - 03/2023] , or refer to PROCEDURE - Step 3 [03/2023 - ] - TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 4 [11/2021 - 03/2023] , or refer to PROCEDURE - Step 4 [03/2023 - ] - INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY
Refer to PROCEDURE - Step 5 [11/2021 - 03/2023] , or refer to PROCEDURE - Step 5 [03/2023 - ] - INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 6 [11/2021 - 03/2023] , or refer to PROCEDURE - Step 6 [03/2023 - ] - CONNECT FUEL TUBE SUB-ASSEMBLY
- Connect the fuel tube sub-assembly to the fuel delivery pipe.
Refer to PRECAUTION [11/2021 - ]
- Connect the fuel tube sub-assembly to the fuel (engine room side) pump assembly.
Refer to PRECAUTION [11/2021 - ]
- Install the EFI fuel pipe clamp (fuel delivery pipe side) to the fuel tube connector.
- Connect the fuel tube sub-assembly to the fuel delivery pipe.
- CONNECT WATER OUTLET STAY
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- INSTALL TURBOCHARGER SUB-ASSEMBLY
-
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Install a new exhaust manifold to head gasket.
- Install the turbocharger sub-assembly with the 4 nuts in the order shown in the illustration.
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
-
- INSTALL NO. 1 TURBO OIL OUTLET GASKET
- INSTALL NO. 1 TURBO OIL PIPE
-
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
*1 Turbo Oil Inlet Gasket *2 Gasket Bolt Nut Oil Pipe Union Bolt - - - Install a new turbo oil inlet gasket and gasket.
HINT:
Face the straight part of the turbo oil inlet gasket toward the outside of the engine.
- Temporarily install the No. 1 turbo oil pipe with the 2 bolts, oil pipe union bolt and 2 nuts in the order shown in the illustration.
- Tighten the 2 bolts, oil pipe union bolt and 2 nuts in the order shown in the illustration.
Bolt
Torque: 24 N.m (245 kgf/cm, 18 ft.lbf)
Oil Pipe Union Bolt
Torque: 35 N.m (357 kgf/cm, 26 ft.lbf)
Nut
Torque: 12 N.m (122 kgf/cm, 9 ft.lbf)
- Install a new turbo oil inlet gasket and gasket.
-
- INSTALL MANIFOLD STAY
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- INSTALL NO. 1 HEAT INSULATOR BRACKET
Refer to PROCEDURE - Step 5
- CONNECT NO. 3 TURBO WATER HOSE
Refer to PROCEDURE - Step 6 - CONNECT NO. 2 TURBO WATER HOSE
Refer to PROCEDURE - Step 7 - INSTALL NO. 1 TURBO INSULATOR
Refer to PROCEDURE - Step 8
- INSTALL COMPRESSOR INLET ELBOW SUB-ASSEMBLY
Refer to PROCEDURE - Step 11 - INSTALL VACUUM REGULATING VALVE ASSEMBLY
Refer to PROCEDURE - Step 1 - INSTALL CONVERTER WITH CATALYST ASSEMBLY
Refer to INSTALLATION [11/2021 - ]
- INSTALL WATER OUTLET GASKET
- INSTALL FRONT WATER BY-PASS JOINT
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- INSTALL WATER CONTROL VALVE
Refer to PROCEDURE - Step 1
- INSTALL INTAKE MANIFOLD WITH INTERCOOLER ASSEMBLY
Refer to PROCEDURE - Step 4 - INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
- CONNECT NO. 5 WATER BY-PASS HOSE
- CONNECT NO. 4 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 7 - CONNECT NO. 4 TURBO WATER HOSE
Refer to PROCEDURE - Step 9 - CONNECT NO. 3 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 11 - CONNECT NO. 1 TURBO WATER HOSE
Refer to PROCEDURE - Step 13 - CONNECT NO. 2 FUEL VAPOR FEED HOSE
- INSTALL AIR TUBE ASSEMBLY
Refer to PROCEDURE - Step 15 - CONNECT NO. 1 VENTILATION PRESSURE SENSOR HOSE
- INSTALL PURGE VALVE (PURGE VSV)
Refer to PROCEDURE - Step 16
- INSTALL NO. 2 ENGINE COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 19
- INSTALL DRIVE SHAFT BEARING BRACKET
Torque: 63.7 N.m (650 kgf/cm, 47 ft.lbf)