Installation [11/2021 - ]: Procedure
- SET EGR VALVE ASSEMBLY
- CONNECT NO. 8 WATER BY-PASS HOSE
- CONNECT NO. 4 WATER BY-PASS HOSE
- INSTALL NO. 1 EGR COOLER GASKET
See step 3 - INSTALL EGR VALVE GASKET
See step 4 - INSTALL EGR COOLER ASSEMBLY
See step 5 - CONNECT NO. 4 WATER BY-PASS HOSE
- CONNECT NO. 3 WATER BY-PASS HOSE
- INSTALL EGR VALVE ASSEMBLY
- INSTALL EGR INLET GASKET
- INSTALL EGR VALVE ADAPTER GASKET
- INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY
- CONNECT ENGINE WIRE
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- CONNECT NO. 2 FUEL VAPOR FEED HOSE ASSEMBLY
- CONNECT FUEL VAPOR FEED HOSE ASSEMBLY
- INSTALL INVERTER WITH CONVERTER ASSEMBLY
Refer to INSTALLATION [11/2021 - ]
- ADD ENGINE COOLANT (for Engine)
Refer to PROCEDURE - Step 5
- INSPECT FOR COOLANT LEAK (for Engine)
Refer to PROCEDURE - Step 1 - INSPECT FOR EXHAUST GAS LEAK
Refer to PROCEDURE - Step 4