Installation [03/2024 - ]: Procedure

WARNING: This page is about a different car, the 2025 Lexus NX 350h, 2024 Lexus NX 350h, 2023 Lexus NX 350h, and 2022 Lexus NX 350h. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL RADIATOR ASSEMBLY 
    1. GTY1078503Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Alignment Mark *b Rib
      *c 2 to 7 mm (0.0787 to 0.276 in.) *d Up
      *e LH Side - -
      1. Engage the 2 claws to install the radiator assembly (for inverter coolant) to the radiator assembly.
        NOTE:

        Be careful not to damage the radiator assembly (for inverter coolant) or radiator assembly.

      2. Install the 4 bolts.

        Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) 

      3. Connect the No. 4 inverter cooling hose to the radiator assembly (for inverter coolant) and slide the clip to secure it.
        NOTE:
        • To prevent foreign matter from entering the radiator assembly (for inverter coolant) and inverter cooling system, do not remove the pieces of cloth from the pipe and disconnected hose until installation.
        • Make sure to align the alignment mark of the hose with the rib of the radiator assembly (for inverter coolant).
        • Do not apply excessive force to the No. 4 inverter cooling hose.

        HINT: 

        Make sure that the clip is positioned as shown in the illustration.

  2. INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 10

  3. INSTALL NO. 1 RADIATOR AIR GUIDE RH 
  4. CONNECT NO. 3 INVERTER COOLING HOSE 
    1. GTY1078189Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Alignment Mark *b Rib
      *c 2 to 7 mm (0.0787 to 0.276 in.) - -
      1. Connect the No. 3 inverter cooling hose to the radiator assembly (for inverter coolant) and slide the clip to secure it.
        NOTE:
        • To prevent foreign matter from entering the radiator assembly (for inverter coolant) and inverter cooling system, do not remove the pieces of cloth from the pipe and disconnected hose until installation.
        • Make sure to align the alignment mark of the hose with the rib of the radiator assembly (for inverter coolant).
        • Do not apply excessive force to the No. 3 inverter cooling hose.
  5. INSTALL NO. 1 RADIATOR AIR GUIDE LH 
  6. INSTALL THERMISTOR ASSEMBLY 

    Refer to INSTALLATION [11/2021 - ]

  7. INSTALL FRONT RADIATOR SIDE AIR GUIDE PLATE LH 

    Refer to PROCEDURE - Step 6

  8. INSTALL FRONT RADIATOR SIDE AIR GUIDE PLATE RH 

    Refer to PROCEDURE - Step 7

  9. INSTALL NO. 3 RADIATOR TO SUPPORT SEAL 

    Refer to PROCEDURE - Step 8

  10. INSTALL NO. 2 RADIATOR TO SUPPORT SEAL 

    Refer to PROCEDURE - Step 9

  11. INSTALL HOOD LOCK ASSEMBLY WITH COURTESY LIGHT SWITCH 
    Refer to PROCEDURE - Step 4
  12. INSTALL HOOD LOCK ASSEMBLY LH 
    Refer to PROCEDURE - Step 5
  13. INSTALL HOOD LOCK CONTROL JUNCTION ASSEMBLY 

    Refer to PROCEDURE - Step 6

  14. CONNECT HOOD LOCK CONTROL CABLE AND LEVER SET 

    Refer to PROCEDURE - Step 7

  15. INSTALL HOOD LOCK CONTROL COVER 

    Refer to PROCEDURE - Step 8

  16. INSTALL HOOD SUPPORT TENSION SPRING 
  17. INSTALL INLET AIR CLEANER ASSEMBLY 
    Refer to PROCEDURE - Step 7
  18. INSTALL HEADLIGHT ASSEMBLY LH 

    for LED Type Turn Signal Light: Refer to INSTALLATION [11/2021 - ]

    for Bulb Type Turn Signal Light: Refer to INSTALLATION [11/2021 - ]

  19. INSTALL HEADLIGHT ASSEMBLY RH 
  20. INSTALL FRONT BUMPER REINFORCEMENT SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 7

  21. INSTALL FRONT NO. 2 BUMPER ENERGY ABSORBER 
  22. INSTALL FRONT BUMPER ASSEMBLY 

    for Sport Package: Refer to INSTALLATION [11/2021 - ]

    except Sport Package: Refer to INSTALLATION [11/2021 - ]

  23. ADD COOLANT (for Inverter) 

    Refer to PROCEDURE - Step 2

  24. INSPECT FOR COOLANT LEAK (for Inverter) 

    Refer to PROCEDURE - Step 1

  25. ADJUST HOOD SUB-ASSEMBLY 

    Refer to ADJUSTMENT [11/2021 - ]

  26. INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY 

    Refer to PROCEDURE - Step 63

  27. INSTALL NO. 1 ENGINE UNDER COVER 

    Refer to PROCEDURE - Step 64

  28. INSTALL FRONT FENDER FRONT SPLASH SHIELD RH 
  29. INSTALL FRONT FENDER FRONT SPLASH SHIELD LH