Installation [11/2021 - 03/2022]: Procedure
- INSTALL STUD BOLT NOTE:
If a stud bolt is deformed or its threads are damaged, replace it.
- INSTALL WIRE HARNESS CLAMP BRACKET
- INSTALL NO. 2 VACUUM SWITCHING VALVE BRACKET
- INSTALL PURGE VALVE (PURGE VSV)
Refer to PROCEDURE - Step 1
- INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR
Torque: 16 N.m (163 kgf/cm, 12 ft.lbf)
- INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
- Apply a light coat of engine oil to a new O-ring.
- Install the O-ring to the engine oil level dipstick guide.
- Using an 8 mm socket wrench, install the engine oil level dipstick guide to the camshaft housing sub-assembly with the bolt.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Install the engine oil level dipstick.
- INSTALL IGNITION COIL ASSEMBLY
Refer to PROCEDURE - Step 2 - INSTALL FUEL INJECTOR SEAL
Refer to PROCEDURE - Step 1 - INSTALL INJECTOR VIBRATION INSULATOR
Refer to PROCEDURE - Step 2 - INSTALL C-RING
Refer to PROCEDURE - Step 3 - INSTALL NO. 1 FUEL INJECTOR BACK-UP RING
Refer to PROCEDURE - Step 4 - INSTALL NO. 3 FUEL INJECTOR BACK-UP RING
Refer to PROCEDURE - Step 5 - INSTALL NOZZLE HOLDER CLAMP
- INSTALL DIRECT FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 7 - INSTALL FUEL DELIVERY PIPE
Refer to PROCEDURE - Step 8 - INSTALL PORT FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 1 - INSTALL NO. 5 ENGINE WIRE
- INSTALL INJECTOR VIBRATION INSULATOR
- INSTALL NO. 1 DELIVERY PIPE SPACER
- INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 5 - INSTALL NO. 6 ENGINE WIRE
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL SENSOR WIRE
- INSTALL NO. 7 WATER BY-PASS HOSE
- INSTALL FUEL PUMP LIFTER ASSEMBLY
Refer to PROCEDURE - Step 1 - INSTALL FUEL PUMP SPACER GASKET
- TEMPORARILY INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY
Refer to PROCEDURE - Step 3 - TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 4 - INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY
Refer to PROCEDURE - Step 5 - INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 6 - CONNECT FUEL TUBE SUB-ASSEMBLY
Refer to PROCEDURE - Step 7 - INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET
- INSTALL INTAKE MANIFOLD
Refer to PROCEDURE - Step 4 - INSTALL NO. 2 WATER BY-PASS PIPE
Refer to PROCEDURE - Step 6
- INSTALL NO. 3 WATER BY-PASS PIPE
- SET EGR VALVE ASSEMBLY
Refer to PROCEDURE - Step 9 - INSTALL NO. 4 WATER BY-PASS HOSE
- INSTALL NO. 1 EGR COOLER GASKET
Refer to PROCEDURE - Step 3 - INSTALL EGR VALVE GASKET
Refer to PROCEDURE - Step 4 - INSTALL EGR COOLER ASSEMBLY
Refer to PROCEDURE - Step 5 - CONNECT NO. 4 WATER BY-PASS HOSE
- CONNECT NO. 3 WATER BY-PASS HOSE
- INSTALL EGR VALVE ASSEMBLY
Refer to PROCEDURE - Step 9 - INSTALL EGR INLET GASKET
- INSTALL EGR VALVE ADAPTER GASKET
- INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 12 - INSTALL THROTTLE BODY GASKET
Refer to PROCEDURE - Step 1 - CONNECT NO. 5 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 2 - INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
Refer to PROCEDURE - Step 3 - CONNECT NO. 6 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 4 - INSTALL EXHAUST MANIFOLD TO HEAD GASKET
- INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst)
Refer to PROCEDURE - Step 3 - INSTALL MANIFOLD STAY
Refer to PROCEDURE - Step 4 - INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
Refer to PROCEDURE - Step 6
- INSTALL NO. 2 WATER HOSE CLAMP BRACKET
Torque: 13 N.m (133 kgf/cm, 10 ft.lbf)
- INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
Torque: 19 N.m (194 kgf/cm, 14 ft.lbf)
- INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
*a 2.0 to 7.0 mm (0.0787 to 0.276 in.) *b 120°(Claw of Clip Location) *c Paint Mark *d Protrusion *e RH Side - - - Connect the No. 2 water by-pass pipe sub-assembly to the water by-pass outlet and slide the clip to secure it.NOTE:
- Make sure to slide the No. 2 water by-pass pipe sub-assembly until it contacts the protrusion of the water by-pass outlet.
- Make sure that the claws of the clip are within the location shown in the illustration.
- Install the No. 2 water by-pass pipe sub-assembly with the bolt.
Torque: 19 N.m (194 kgf/cm, 14 ft.lbf)
- Connect the No. 2 water by-pass pipe sub-assembly to the water by-pass outlet and slide the clip to secure it.
- INSTALL NO. 2 TIMING CHAIN COVER INSULATOR
- INSTALL V-RIBBED BELT TENSIONER ASSEMBLY NOTE:
- Do not apply or add any oil or grease to the belt tensioner to prevent abnormal noises from the belt tensioner pulley, belt squealing, etc.
- Do not allow oil or grease to adhere to the moving parts of the belt tensioner, as this may cause malfunctions.
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- INSTALL COMPRESSOR ASSEMBLY WITH PULLEY
Refer to PROCEDURE - Step 2 - INSTALL GENERATOR ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL V-RIBBED BELT
Refer to PROCEDURE - Step 1 - INSTALL NO. 2 ENGINE COVER
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL DRIVE SHAFT BEARING BRACKET
Torque: 63.7 N.m (650 kgf/cm, 47 ft.lbf)