ECU Power Source Circuit [09/2023 - ]: Procedure
- CHECK HARNESS AND CONNECTOR (BATT TERMINAL VOLTAGE)
- Measure the voltage according to the value(s) in the table below.
*a Component with harness connected
(Shift Control ECU (Transmission Floor Shift Assembly))Standard Voltage
Tester Connection Condition Specified Condition D25-2 (BATT) - Body ground Ignition switch off 11 to 14 V Result
Proceed to OK NG
Result:
NG
See step 7
Result:
OK
See step 2
- Measure the voltage according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (IGCT, IGP TERMINAL VOLTAGE)
- Turn the ignition switch to ON.
- Measure the voltage according to the value(s) in the table below.
*a Component with harness connected
(Shift Control ECU (Transmission Floor Shift Assembly))Standard Voltage
Tester Connection Condition Specified Condition D25-3 (IGCT) - Body ground Ignition switch ON 11 to 14 V D25-1 (IGP) - Body ground Ignition switch ON 11 to 14 V - Turn the Ignition switch off.
Result
Proceed to OK NG
Result:
NG
See step 8
Result:
OK
See step 3
- CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - BODY GROUND)
- Disconnect the D25 shift control ECU (transmission floor shift assembly) connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition D25-9 (E1) - Body ground Always Below 1 Ω D25-23 (E12) - Body ground Always Below 1 Ω - Reconnect the shift control ECU (transmission floor shift assembly) connector.
Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (SHIFT CONTROL ECU - BODY GROUND)
Result:
OK
See step 4
- CHECK HARNESS AND CONNECTOR (MA1, BAT1 TERMINAL VOLTAGE)
- Disconnect the C53 and C64 shift actuator ECU (shift control actuator assembly) connectors.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition C53-1 (MA1) - Body ground Ignition switch off 11 to 14 V C64-8 (BAT1) - Body ground Ignition switch off 11 to 14 V - Reconnect the shift actuator ECU (shift control actuator assembly) connector.
Result
Proceed to OK NG
Result:
NG
See step 9
Result:
OK
See step 5
- CHECK HARNESS AND CONNECTOR (IGCT TERMINAL VOLTAGE)
- Disconnect the C53 shift actuator ECU (shift control actuator assembly) connector.
- Turn the ignition switch to ON.NOTE:
If the ignition switch is turned to ON with the connector disconnected, other DTCs will be stored. Be sure to clear the DTCs after the inspection.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition C53-5 (IGC1) - Body ground Ignition switch ON 11 to 14 V - Turn the Ignition switch off.
- Reconnect the shift actuator ECU (shift control actuator assembly) connector.
Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (SHIFT ACTUATOR ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
Result:
OK
See step 6
- CHECK HARNESS AND CONNECTOR (SHIFT ACTUATOR ECU - BODY GROUND)
- Disconnect the C53 shift actuator ECU (shift control actuator assembly) connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition C53-2 (E01) - Body ground Always Below 1 Ω C53-7 (E02) - Body ground Always Below 1 Ω - Reconnect the shift actuator ECU (shift control actuator assembly) connector.
Result
Proceed to OK NG
Result:
OK
GO TO PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE [09/2023 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (SHIFT ACTUATOR ECU - BODY GROUND)
- CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY)
- Remove the P CON MAIN fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
- Disconnect the C64 shift actuator ECU (shift control actuator assembly) connector.
- Disconnect the D25 shift control ECU (transmission floor shift assembly) connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition D25-2 (BATT) - 2 (P CON MAIN fuse holder) Always Below 1 Ω D25-2 (BATT) or 2 (P CON MAIN fuse holder) - Body ground and other terminals Always 10 kΩ or higher - Reconnect the shift control ECU (transmission floor shift assembly) connector.
- Reconnect the shift actuator ECU (shift control actuator assembly) connector.
- Install the P CON MAIN fuse.
Result
Proceed to OK NG
Result:
OK
REPAIR OR REPLACE HARNESS OR CONNECTOR (AUXILIARY BATTERY - NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (SHIFT CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
- CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY)
- Remove the IGCT NO. 3 fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
- Remove the ECU-IGP NO. 3 fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
- Disconnect the C53 shift actuator ECU (shift control actuator assembly) connector.
- Disconnect the D25 shift control ECU (transmission floor shift assembly) connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition D25-3 (IGCT) - 2 (IGCT NO. 3 fuse holder) Always Below 1 Ω D25-1 (IGP) - 2 (ECU-IGP NO. 3 fuse holder) Always Below 1 Ω D25-3 (IGCT) or 2 (IGCT NO. 3 fuse holder) - Body ground and other terminals Always 10 kΩ or higher D25-1 (IGP) or 2 (ECU-IGP NO. 3 fuse holder) - Body ground and other terminals Always 10 kΩ or higher - Reconnect the shift control ECU (transmission floor shift assembly) connector.
- Reconnect the shift actuator ECU (shift control actuator assembly) connector.
- Install the ECU-IGP NO. 3 fuse.
- Install the IGCT NO. 3 fuse.
Result
Proceed to OK NG
Result:
OK
REPAIR OR REPLACE HARNESS OR CONNECTOR (IGCT NO. 1 RELAY POWER SUPPLY, IGP NO. 1 RELAY POWER SUPPLY)
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (SHIFT CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
- CHECK HARNESS AND CONNECTOR (SHIFT ACTUATOR ECU - ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY)
- Remove the P CON MTR fuse from the No. 1 engine room relay block and No. 1 junction block assembly.
- Remove the P CON MAIN fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
- Disconnect the D25 shift control ECU (transmission floor shift assembly) connector.
- Disconnect the C53 and C64 shift actuator ECU (shift control actuator assembly) connectors.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition C53-1 (MA1) - 2 (P CON MTR fuse holder) Always Below 1 Ω C64-8 (BAT1) - 2 (P CON MAIN fuse holder) Always Below 1 Ω C53-1 (MA1) or 2 (P CON MTR fuse holder) - Body ground and other terminals Always 10 kΩ or higher C64-8 (BAT1) or 2 (P CON MAIN fuse holder) - Body ground and other terminals Always 10 kΩ or higher - Reconnect the shift actuator ECU (shift control actuator assembly) connector.
- Reconnect the shift control ECU (transmission floor shift assembly) connector.
- Install the P CON MAIN fuse.
- Install the P CON MTR fuse.
Result
Proceed to OK NG
Result:
OK
REPAIR OR REPLACE HARNESS OR CONNECTOR (AUXILIARY BATTERY - ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY)
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (SHIFT ACTUATOR ECU - ENGINE ROOM RELAY BLOCK AND JUNCTION BLOCK ASSEMBLY)