DTC P12D4-1D: Fuel Pump Control Circuit Current Out of Range [09/2023 - ]: Procedure
WARNING: This page is about a different car, the 2024 Lexus TX 500h. However, it is still accessible from the selected car via links, so may be relevant.
- INSPECT FUEL PUMP CONTROL ECU
Pre-procedure1
- Disconnect the fuel pump control ECU connector.
- Measure the resistance according to the value(s) in the table below.
*1 Component without harness connected
(Fuel Pump Control ECU)- - Standard Resistance
Tester Connection Condition Specified Condition Result J21-2 (FPU) - J22-3 (GND) Always 2 kΩ or higher kΩ J21-3 (FPV) - J22-3 (GND) Always 2 kΩ or higher kΩ J21-4 (FPW) - J22-3 (GND) Always 2 kΩ or higher kΩ HINT:
This procedure checks for an internal short of the fuel pump control ECU when its transistor is stuck on.
Result
Proceed to OK NG
Post-procedure1
- None
Result:
NG
REPLACE FUEL PUMP CONTROL ECU. Refer to REMOVAL [09/2023 - ]
Result:
OK
See step 2
- PERFORM ACTIVE TEST USING GTS (FUEL PUMP SINGLE PHASE ENERGIZATION)
Pre-procedure1
- Disconnect the J21 fuel pump control ECU connector.
- Operate the fuel pump control ECU using the Active Test function and measure the voltage according to the value(s) in the table below.
*1 Component without harness connected
(Fuel Pump Control ECU)Powertrain > Engine > Active Test
Tester Display Fuel Pump Single Phase Energization Standard Voltage
Tester Connection GTS Operation Specified Condition Result J21-2 (FPU) - Body ground U Phase* 4.4 to 8.4 V V J21-3 (FPV) - Body ground U Phase 8 to 15.5 V V J21-4 (FPW) - Body ground U Phase 8 to 15.5 V V J21-3 (FPV) - Body ground V Phase* 4.4 to 8.4 V V J21-2 (FPU) - Body ground V Phase 8 to 15.5 V V J21-4 (FPW) - Body ground V Phase 8 to 15.5 V V J21-4 (FPW) - Body ground W Phase* 4.4 to 8.4 V V J21-2 (FPU) - Body ground W Phase 8 to 15.5 V V J21-3 (FPV) - Body ground W Phase 8 to 15.5 V V HINT:
- *: This Active Test limits the fuel pump control ECU output duty cycle to 50%. Therefore, the output voltage of the fuel pump control ECU will be approximately 50% of the power source voltage (+B terminal).
- Before performing this inspection, check that the auxiliary battery voltage is between 11 and 14 V (not depleted).
Result
Proceed to OK NG
Post-procedure1
- None
Result:
NG
REPLACE FUEL PUMP CONTROL ECU. Refer to REMOVAL [09/2023 - ]
Result:
OK
See step 3
- CHECK HARNESS AND CONNECTOR (FUEL PUMP CONTROL ECU - FUEL PUMP (FOR LOW PRESSURE SIDE))
Pre-procedure1
- Disconnect the fuel pump control ECU connector.
- Disconnect the fuel pump (for low pressure side) connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Result J21-2 (FPU) or J29-3 (BLPU) - Other terminals Always 10 kΩ or higher kΩ J21-3 (FPV) or J29-4 (BLPV) - Other terminals Always 10 kΩ or higher kΩ J21-4 (FPW) or J29-2 (BLPW) - Other terminals Always 10 kΩ or higher kΩ Result
Proceed to OK NG
Post-procedure1
- None
Result:
OK
REPLACE FUEL PUMP (FOR LOW PRESSURE SIDE). Refer to REMOVAL [09/2023 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR