LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2024 >> TX 350 Base, FWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 104 (Engine Control System - Diagnostic Codes (5 Of 7)) >> SFI SYSTEM (for 1Motor-HEV Model) >> DTC P1235-13: High Pressure Fuel Pump Circuit Open [09/2023 - ] >> Procedure

DTC P1235-13: High Pressure Fuel Pump Circuit Open [09/2023 - ]: Procedure

WARNING: This page is about a different car, the 2024 Lexus TX 500h. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSPECT FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (FOR HIGH PRESSURE SIDE) 

    Refer to INSPECTION [09/2023 - ]

    Result

    Proceed to
    OK
    NG

    Result: 

    NG 

    REPLACE FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (FOR HIGH PRESSURE SIDE). Refer to  REMOVAL [09/2023 - ] 

    Result: 

    OK 

    See step  2

  2. CHECK HARNESS AND CONNECTOR (FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (FOR HIGH PRESSURE SIDE) - ECM) 

    Pre-procedure1

    • Disconnect the fuel (engine room side) pump assembly (for high pressure side) connector.
    • Disconnect the ECM connector.
    • Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition Result
      C14-2 (FP+) - C26-11 (FP1+) Always Below 1 Ω Ω
      C14-1 (FP-) - C26-10 (FP1-) Always Below 1 Ω Ω
      C14-2 (FP+) or C26-11 (FP1+) - Body ground and other terminals Always 10 kΩ or higher
      C14-1 (FP-) or C26-10 (FP1-) - Body ground and other terminals Always 10 kΩ or higher

      Result

      Proceed to
      OK
      NG

    Post-procedure1

    • None

    Result: 

    OK 

    REPLACE ECM. Refer to  REMOVAL [09/2023 - ] 

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR