LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2024 >> TX 350 Base, AWD >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge / Display - Service Information >> HEADUP Display >> Installation [09/2023 - ] >> Procedure

Installation [09/2023 - ]: Procedure

  1. INSTALL METER MIRROR SUB-ASSEMBLY 
    1. Fig 1: Meter Mirror Sub-Assembly Tightening Sequence
      GTY1231600Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Engage the guide and clip.
      2. Install the meter mirror sub-assembly with the 3 bolts in the order shown in the illustration.

        Torque: 12.5 N.m (127 kgf/cm, 9 ft.lbf) 

      3. Connect the 2 connectors.
  2. INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY 

    Refer to INSTALLATION [09/2023 - ]