Home >> Lexus >> 2024 >> RX 500h >> Repair and Diagnosis >> External Pages >> Different car >> Section 122 (Electronic A/T Shift Lever System - Diagnostic Codes (1 Of 2)) >> Electronic Shift Lever System >> DTC P1779-49: Gear Shift Control Module Backup Power Supply Internal Electronic Failure [08/2023 - ] >> Procedure

DTC P1779-49: Gear Shift Control Module Backup Power Supply Internal Electronic Failure [08/2023 - ]: Procedure

WARNING: This page is about a different car, the 2025 Lexus RX 350, 2024 Lexus RX 350, and 2023 Lexus RX 350. However, it is still accessible from the selected car via links, so may be relevant.
  1. CHECK VEHICLE CONDITION 
    1. Choose the model to be inspected.

      Result

      Result Proceed to
      w/o Advanced Park (Remote Controlled) A
      w/ Advanced Park (Remote Controlled) B

    Result: 

    See step  7

    Result: 

    See step  2

  2. CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - SHIFT ACTUATOR ECU) 

    Pre-procedure1

    • Disconnect the H116 integration control supply (integrated capacitor) connector.
    • Disconnect the B56 shift control actuator assembly (shift actuator ECU) connector.
    • Measure the voltage according to the value(s) in the table below.

      Standard Voltage

      Tester Connection Condition Specified Condition Result
      H116-19 (BUA) - Body ground Always Below 1 V V
      H116-9 (BUAE) - Body ground Always Below 1 V V

      Result

      Proceed to
      OK
      NG

    Post-procedure1

    • Connect the shift control actuator assembly (shift actuator ECU) connector.
    • Connect the integration control supply (integrated capacitor) connector.

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Result: 

    OK 

    See step  3

  3. CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - SHIFT CONTROL ECU) 

    Pre-procedure1

    • Disconnect the H116 integration control supply (integrated capacitor) connector.
    • Disconnect the C35 transmission floor shift assembly (shift control ECU) connector.
    • Measure the voltage according to the value(s) in the table below.

      Standard Voltage

      Tester Connection Condition Specified Condition Result
      H116-1 (BUSE) - Body ground Always Below 1 V V

      Result

      Proceed to
      OK
      NG

    Post-procedure1

    • Connect the transmission floor shift assembly (shift control ECU) connector.
    • Connect the integration control supply (integrated capacitor) connector.

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Result: 

    OK 

    See step  4

  4. CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - POWER DESTRIBUTION BOX ASSEMBLY) 

    Pre-procedure1

    • Disconnect the H116 integration control supply (integrated capacitor) connector.
    • Disconnect the C90 power distribution box assembly connector.
    • Measure the voltage according to the value(s) in the table below.

      Standard Voltage

      Tester Connection Condition Specified Condition Result
      H116-10 (BUE2) - Body ground Always Below 1 V V

      Result

      Proceed to
      OK
      NG

    Post-procedure1

    • Connect the power distribution box assembly connector.
    • Connect the integration control supply (integrated capacitor) connector.

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Result: 

    OK 

    See step  5

  5. INSPECT POWER DISTRIBUTION BOX ASSEMBLY 

    Pre-procedure1

    • Remove the main body ECU (multiplex network body ECU) from the power distribution box assembly.

      HINT: 

      Refer to REMOVAL [08/2023 - ]

    • Measure the resistance according to the value(s) in the table below.
      GTY1124648Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Power Distribution Box Assembly)
      - -

      Standard Resistance

      Tester Connection Condition Specified Condition Result
      C90-27 or z31-25 (SBAT) - Other terminals Always 10 kΩ or higher

      Result

      Proceed to
      OK
      NG

    Post-procedure1

    • Install the main body ECU (multiplex network body ECU) to the power distribution box assembly.

      HINT: 

      Refer to INSTALLATION [10/2022 - ]

    Result: 

    NG 

    REPLACE POWER DISTRIBUTION BOX ASSEMBLY. Refer to  REMOVAL [08/2023 - ] 

    Result: 

    OK 

    See step  6

  6. CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - DOOR LOCK ASSEMBLY) 

    Pre-procedure1

    • Disconnect the H116 integration control supply (integrated capacitor) connector.
    • Disconnect the D34 front door lock with motor assembly LH connector.
    • Disconnect the D15 front door lock with motor assembly RH connector.
    • Disconnect the E16 rear door lock with motor assembly LH connector.
    • Disconnect the E6 rear door lock with motor assembly RH connector.
    • Measure the voltage according to the value(s) in the table below.

      Standard Voltage

      Tester Connection Condition Specified Condition Result
      H116-20 (BUA2) - Body ground Always Below 1 V V

      Result

      Proceed to
      OK
      NG

    Post-procedure1

    • Connect the rear door lock with motor assembly RH connector.
    • Connect the rear door lock with motor assembly LH connector.
    • Connect the front door lock with motor assembly RH connector.
    • Connect the front door lock with motor assembly LH connector.
    • Connect the integration control supply (integrated capacitor) connector.

    Result: 

    OK 

    REPLACE INTEGRATION CONTROL SUPPLY (INTEGRATED CAPACITOR). Refer to  REMOVAL [08/2023 - ] 

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR 

  7. CHECK DTC OUTPUT (SUB BATTERY SYSTEM) 

    Pre-procedure1

    • Turn the ignition switch to ON.
    • Check for DTCs.

      Body Electrical > Sub Battery System > Trouble Codes 

      Result

      Proceed to
      NEXT

    Post-procedure1

    • Turn the ignition switch off.

    Result: 

    NEXT 