ECU Power Source Circuit [10/2022 - ]: Procedure
- CHECK HYBRID VEHICLE CONTROL ECU ASSEMBLY (+B1, +B2 VOLTAGE)
- Measure the voltage according to the value(s) in the table below.
*a Component with harness connected
(Hybrid Vehicle Control ECU)- - Standard Voltage
Tester Connection Condition Specified Condition C59-8 (+B1) - Body ground Ignition switch ON 11 to 14 V A21-10 (+B2) - Body ground Ignition switch ON 11 to 14 V Result
Proceed to OK NG - Turn the ignition switch off.
Result:
NG
See step 3
Result:
OK
See step 2
- Measure the voltage according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (HYBRID VEHICLE CONTROL ECU - BODY GROUND)
- Disconnect the hybrid vehicle control ECU connectors.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition C59-1 (E1) - Body ground Always Below 1 Ω A21-12 (E01) - Body ground Always Below 1 Ω A21-24 (E12) - Body ground Always Below 1 Ω Result
Proceed to OK NG - Reconnect the hybrid vehicle control ECU connectors.
Result:
OK
GO TO PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE [10/2022 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- CHECK HYBRID VEHICLE CONTROL ECU ASSEMBLY (MREL VOLTAGE)
- Measure the voltage according to the value(s) in the table below.
*a Component with harness connected
(Hybrid Vehicle Control ECU)- - Standard Voltage
Tester Connection Condition Specified Condition C59-10 (MREL) - Body ground Ignition switch ON 11 to 14 V Result
Proceed to OK NG - Turn the Ignition switch off.
Result:
NG
REPLACE HYBRID VEHICLE CONTROL ECU ASSEMBLY. Refer to REMOVAL [10/2022 - ]
Result:
OK
See step 4
- Measure the voltage according to the value(s) in the table below.
- CHECK FUSE (PM-IGCT)
- Remove the PM-IGCT fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition PM-IGCT fuse terminals Always Below 1 Ω Result
Proceed to OK NG - Install the PM-IGCT fuse.
Result:
NG
See step 10
Result:
OK
See step 5
- INSPECT RELAY (IGCT NO. 1)
- Remove the IGCT NO. 1 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
- Measure the resistance according to the value(s) in the table below.
*1 IGCT NO. 1 Relay Standard Resistance
Tester Connection Condition Specified Condition 3 - 5 Auxiliary battery voltage not applied between terminals 1 and 2 10 kΩ or higher Auxiliary battery voltage applied between terminals 1 and 2 Below 1 Ω Result
Proceed to OK NG - Install the IGCT No. 1 relay.
Result:
NG
REPLACE RELAY (IGCT NO. 1)
Result:
OK
See step 6
- CHECK HARNESS AND CONNECTOR (HYBRID VEHICLE CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
- Disconnect the hybrid vehicle control ECU connectors.
- Remove the PM-IGCT fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition C59-8 (+B1) - 2 (PM-IGCT fuse holder) Always Below 1 Ω A21-10 (+B2) - 2 (PM IGCT fuse holder) Always Below 1 Ω Result
Proceed to OK NG - Reconnect the hybrid vehicle control ECU connectors.
- Install the PM-IGCT fuse.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 7
- CHECK HARNESS AND CONNECTOR (IGCT NO. 1 RELAY - PM-IGCT FUSE)
- Remove the IGCT NO. 1 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
- Remove the PM-IGCT fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 5 (IGCT NO. 1 relay holder) - 1 (PM-IGCT fuse terminal) Always Below 1 Ω - Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition 3 (IGCT NO. 1 relay holder) - Body ground Always 7.5 to 14 V Result
Proceed to OK NG - Install the PM IGCT fuse and IGCT NO. 1 relay.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 8
- CHECK HARNESS AND CONNECTOR (HYBRID VEHICLE CONTROL ECU - NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY)
- Disconnect the hybrid vehicle control ECU connector.
- Remove the IGCT NO. 1 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition C59-10 (MREL) - 1 (IGCT NO. 1 relay holder) Always Below 1 Ω C59-10 (MREL) or 1 (IGCT NO. 1 relay holder) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG - Install the IGCT NO. 1 relay.
- Reconnect the hybrid vehicle control ECU connector.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 9
- CHECK HARNESS AND CONNECTOR (NO. 1 ENGINE ROOM RELAY BLOCK AND NO. 1 JUNCTION BLOCK ASSEMBLY - BODY GROUND)
- Remove the IGCT NO. 1 relay from the No. 1 engine room relay block and No. 1 junction block assembly
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 2 (IGCT NO. 1 relay holder) - Body ground Always Below 1 Ω Result
Proceed to OK NG - Install the IGCT NO. 1 relay.
Result:
OK
CHECK FOR INTERMITTENT PROBLEMS. Refer to CHECK FOR INTERMITTENT PROBLEMS [10/2022 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- CHECK HARNESS AND CONNECTOR (NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY - HYBRID VEHICLE CONTROL ECU)
- Remove the PM-IGCT fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
- Disconnect the hybrid vehicle control ECU connectors.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition C59-8 (+B1) or 2 (PM-IGCT fuse holder) - Body ground and other terminals Always 10 kΩ or higher A21-10 (+B2) or 2 (PM-IGCT fuse holder) - Body ground and other terminals Always 10 kΩ or higher - Reconnect the hybrid vehicle control ECU connectors.
- Install the PM-IGCT fuse.
Result
Proceed to OK NG
Result:
OK
REPLACE FUSE (PM IGCT)
Result:
NG
See step 11
- REPAIR OR REPLACE HARNESS OR CONNECTOR
Result
Proceed to NEXT Result:
NEXT
REPLACE FUSE (PM IGCT)