DTC P2533-14: Ignition Switch On/Start Position Circuit Low Circuit Short to Ground or Open [10/2022 - ]: Procedure
WARNING: This page is about a different car, the 2025 Lexus RX 350, 2024 Lexus RX 350, and 2023 Lexus RX 350. However, it is still accessible from the selected car via links, so may be relevant.
- READ VALUE USING GTS (IGR)
- Read the Data List.
Powertrain > Engine > Data List
Tester Display IGR Result
Result Proceed to The value of IGR is ON A None of the above conditions are met B
Result:
A
CHECK FOR INTERMITTENT PROBLEMS. Refer to CHECK FOR INTERMITTENT PROBLEMS [10/2022 - ]
Result:
B
See step 2
- Read the Data List.
- CHECK TERMINAL VOLTAGE (IGR VOLTAGE)
Pre-procedure1
- Disconnect the ECM connector.
- Turn the ignition switch to ON.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition Result A16-22 (IGR) - Body ground Ignition switch ON 11 to 14 V V Result
Proceed to OK NG
Post-procedure1
- None.
Result:
OK
REPLACE ECM. Refer to REMOVAL [10/2022 - ]
Result:
NG
See step 3
- CHECK HARNESS AND CONNECTOR (POWER DISTRIBUTION BOX ASSEMBLY - ECM)
Pre-procedure1
- Disconnect the ECM connector.
- Disconnect the power distribution box assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Result A72-13 - A16-22 (IGR) Always Below 1 Ω Ω A72-13 or A16-22 (IGR) - Body ground and other terminals Always 10 kΩ or higher kΩ Result
Proceed to OK NG
Post-procedure1
- None.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 4
- CHECK HARNESS AND CONNECTOR (POWER DISTRIBUTION BOX ASSEMBLY - BODY GROUND)
Pre-procedure1
- Disconnect the power distribution box assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Result C89-36 - Body ground Always Below 1 Ω Ω C90-41 - Body ground Always Below 1 Ω Ω Result
Proceed to OK NG
Post-procedure1
- None.
Result:
OK
REPLACE POWER DISTRIBUTION BOX ASSEMBLY
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR