Removal [11/2017 - ]: Procedure
- REMOVE SHIFT LEVER CAP
- REMOVE FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)
- for 8AR-FTS:
Refer to REMOVAL [10/2015 - ]
- for 2GR-FKS:
Refer to REMOVAL [11/2017 - ]
- for 8AR-FTS:
- REMOVE FRONT NO. 1 FLOOR HEAT INSULATOR
Refer to PROCEDURE - Step 4
- DISCONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- REMOVE CONSOLE BOX ASSEMBLY
Refer to REMOVAL [09/2014 - 10/2018] , or refer to REMOVAL [10/2018 - ]
- REMOVE NO. 1 CONSOLE BOX DUCT
- REMOVE TRANSMISSION FLOOR SHIFT ASSEMBLY