Adjustment [11/2017 - ]: Procedure
- REMOVE FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)
- for 8AR-FTS:
Refer to REMOVAL [10/2015 - ]
- for 2GR-FKS:
Refer to REMOVAL [11/2017 - ]
- for 8AR-FTS:
- REMOVE FRONT NO. 1 FLOOR HEAT INSULATOR
Refer to PROCEDURE - Step 4
- ADJUST SHIFT LEVER POSITION
- Move the shift lever to N.
- Remove the nut and disconnect the floor shift gear shifting rod sub-assembly from the lever of the transmission floor shift assembly.
*a Lever - Turn the transmission control shaft lever RH counterclockwise until it stops, then turn it clockwise 2 notches.
*1 Transmission Control Shaft Lever RH *a P *b R *c N - Connect the floor shift gear shifting rod sub-assembly to the lever of the transmission floor shift assembly.
*a Lever Rear of the Vehicle - Temporarily install the nut to the lever of the transmission floor shift assembly.
- Tighten the nut while lightly pushing the lever of the transmission floor shift assembly toward the rear of the vehicle.
Torque: 12.8 N.m (131 kgf/cm, 9 ft.lbf)
NOTE:Do not push the lever of the transmission floor shift assembly too hard.
- INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
Refer to PROCEDURE - Step 5
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)
- for 8AR-FTS:
Refer to INSTALLATION [10/2015 - ]
- for 2GR-FKS:
Refer to INSTALLATION [11/2017 - ]
- for 8AR-FTS:
- INSPECT SHIFT LEVER POSITION
See step 1
- INSPECT FOR EXHAUST GAS LEAK
- for 8AR-FTS:
Refer to PROCEDURE - Step 8
- for 2GR-FKS:
Refer to PROCEDURE - Step 9
- for 8AR-FTS: