Installation [11/2017 - ]: Procedure
- INSTALL SUSPENSION TOWER DAMPER
- Install the suspension tower damper to the front upper No. 2 suspension member with the 4 bolts.
Torque: 20 N.m (204 kgf/cm, 15 ft.lbf)
NOTE:Do not extend or compress the damper.
- Install the suspension tower damper to the front upper No. 2 suspension member with the 4 bolts.
- INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
for 2GR-FKS: Refer to PROCEDURE - Step 105
for 8AR-FTS: Refer to PROCEDURE - Step 78