Installation [11/2017 - ]: Procedure
- INSTALL V-RIBBED BELT
HINT:
When reusing the V-ribbed belt, check the ribs and back of the V-ribbed belt for wear and cracks. If wear or a crack that reaches the core (at more than 1 point) is found, replace the V-ribbed belt.
- Install the V-ribbed belt.
*1 Water Pump Assembly *2 No. 2 Idler Pulley Sub-assembly *3 Generator Assembly *4 Crankshaft Pulley *5 V-ribbed Belt Tensioner Assembly *6 Compressor and Magnetic Clutch Assembly NOTE:- Make sure to put the backside of the V-ribbed belt on the V-ribbed belt tensioner assembly pulley and No. 2 idler pulley sub-assembly.
- Check that the V-ribbed belt is properly set to each pulley.
- Turn the V-ribbed belt tensioner assembly counterclockwise and remove the 5 mm hexagon wrench.
- After installing the V-ribbed belt, check that it fits properly in the ribbed grooves. Confirm that the V-ribbed belt has not slipped out of the grooves on the bottom of the pulley by hand.
*a Correct *b Incorrect
- Install the V-ribbed belt.
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 106
- INSTALL INLET NO. 1 AIR CLEANER
Refer to PROCEDURE - Step 77
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 2 [11/2017 - 10/2018] , or refer to PROCEDURE - Step 2 [10/2018 - 10/2022] , or refer to PROCEDURE - Step 2 [10/2022 - ]
- INSTALL ENGINE ROOM SIDE COVER
Refer to PROCEDURE - Step 3 [11/2017 - 10/2018] , or refer to PROCEDURE - Step 3 [10/2018 - 10/2022] , or refer to PROCEDURE - Step 3 [10/2022 - ]