DTC P1779-96: Gear Shift Control Module Backup Power Supply Component Internal Failure [11/2021 - ]: Procedure
- CHECK FREEZE FRAME DATA (GEAR SHIFT CONTROL MODULE BACKUP SIGNAL STATUS)
Pre-procedure1
- Turn the ignition switch to ON.
Procedure1
- Read the freeze frame data of DTC P1779-96.
Powertrain > Hybrid Control > DTC (P1779-96) > Freeze Frame Data
Tester Display Gear Shift Control Module Backup Signal Status Result
Result Proceed to The value of Gear Shift Control Module Backup Signal Status is not Capacitor External Failure A The value of Gear Shift Control Module Backup Signal Status is Capacitor External Failure B Post-procedure1
- Turn the ignition switch off.
Result:
B
See step 16
Result:
A
See step 2
- Turn the ignition switch to ON.
- CHECK FREEZE FRAME DATA (GEAR SHIFT CONTROL MODULE BACKUP SIGNAL STATUS)
Pre-procedure1
- Turn the ignition switch to ON.
Procedure1
- Read the freeze frame data of DTC P1779-96.
Powertrain > Hybrid Control > DTC (P1779-96) > Freeze Frame Data
Tester Display Gear Shift Control Module Backup Signal Status Result
Result Proceed to The value of Gear Shift Control Module Backup Signal Status is not Capacitor External Failure (Backup Possible) A The value of Gear Shift Control Module Backup Signal Status is Capacitor External Failure (Backup Possible) B Post-procedure1
- Turn the ignition switch off.
Result:
B
See step 10
Result:
A
See step 3
- Turn the ignition switch to ON.
- CONFIRM VEHICLE SPECIFICATION
- Choose the model to be inspected.
Result
Result Proceed to w/o Advanced Park System A w/ Advanced Park System B
Result:
A
See step 5
Result:
B
See step 4
- Choose the model to be inspected.
- CHECK FREEZE FRAME DATA (GEAR SHIFT CONTROL MODULE BACKUP SIGNAL STATUS)
Pre-procedure1
- Turn the ignition switch to ON.
Procedure1
- Read the freeze frame data of DTC P1779-96.
Powertrain > Hybrid Control > DTC (P1779-96) > Freeze Frame Data
Tester Display Gear Shift Control Module Backup Signal Status Result
Result Proceed to The value of Gear Shift Control Module Backup Signal Status is not Capacitor External Failure (Brake Factor) A The value of Gear Shift Control Module Backup Signal Status is Capacitor External Failure (Brake Factor) B Post-procedure1
- Turn the ignition switch off.
Result:
B
See step 7
Result:
A
See step 5
- Turn the ignition switch to ON.
- CLEAR DTC
Pre-procedure1
- Turn the ignition switch off and wait for 10 minutes or more.
- Turn the ignition switch to ON.
Procedure1
- Clear the DTCs.
Powertrain > Hybrid Control > Clear DTCs
Result
Proceed to NEXT Post-procedure1
- Turn the ignition switch off.
Result:
NEXT
See step 6
- CHECK DTC OUTPUT (PERFORM A REPRODUCTION TEST)
Pre-procedure1
- Turn the ignition switch to ON and wait for 10 seconds or more.
- Turn the ignition switch off and wait for 10 minutes or more.
- Turn the ignition switch to ON.
Procedure1
- Check for DTCs.
Powertrain > Hybrid Control > Trouble Codes
Result
Result Proceed to P1779-96 is output A P1779-96 is not output B Post-procedure1
- Turn the ignition switch off.
Result:
A
REPLACE INTEGRATION CONTROL SUPPLY (INTEGRATED CAPACITOR). Refer to REMOVAL [11/2021 - ]
Result:
B
CHECK FOR INTERMITTENT PROBLEMS
Refer to HOW TO PROCEED WITH TROUBLESHOOTING [11/2021 - ]
Refer to ELECTRONIC CIRCUIT INSPECTION PROCEDURE [11/2021 - ]
- CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - SWITCHING CIRCUIT)
Pre-procedure1
- Disconnect the G102 integration control supply (integrated capacitor) connector.
- Disconnect the G132 second power supply remote parking circuit (switching circuit) connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G102-6 (BUA3) - G132-5 (B1A2) Always Below 1 Ω G102-8 (BUE3) - G132-3 (B1E2) Always Below 1 Ω G102-6 (BUA3) or G132-5 (B1A2) - Body ground and other terminals Always 10 kΩ or higher G102-8 (BUE3) or G132-3 (B1E2) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Connect the second power supply remote parking circuit (switching circuit) connector.
- Connect the integration control supply (integrated capacitor) connector.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 8
- CHECK HARNESS AND CONNECTOR (SWITCHING CIRCUIT - NO. 1 SKID CONTROL ECU)
Pre-procedure1
- Disconnect the G132 and G134 second power supply remote parking circuit (switching circuit) connectors.
- Disconnect the A39 No. 1 skid control ECU (brake booster with master cylinder assembly) connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G134-2 (BOA) - A39-15 (BS) Always Below 1 Ω G132-8 (BOE) - A39-14 (+BI1) Always Below 1 Ω G134-2 (BOA) or A39-15 (BS) - Body ground and other terminals Always 10 kΩ or higher G132-8 (BOE) or A39-14 (+BI1) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Connect the No. 1 skid control ECU (brake booster with master cylinder assembly) connector.
- Connect the second power supply remote parking circuit (switching circuit) connectors.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 9
- INSPECT SECOND POWER SUPPLY REMOTE PARKING CIRCUIT (SWITCHING CIRCUIT)
- Inspect the second power supply remote parking circuit (switching circuit).
HINT:
Refer to PROCEDURE - Step 3 [11/2021 - 03/2024] , or refer to PROCEDURE - Step 3 [03/2024 - ]
Result
Proceed to OK NG
Result:
OK
REPLACE INTEGRATION CONTROL SUPPLY (INTEGRATED CAPACITOR). Refer to REMOVAL [11/2021 - ]
Result:
NG
REPLACE SECOND POWER SUPPLY REMOTE PARKING CIRCUIT (SWITCHING CIRCUIT). Refer to REMOVAL [11/2021 - ]
- Inspect the second power supply remote parking circuit (switching circuit).
- CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - POWER DISTRIBUTION BOX ASSEMBLY)
Pre-procedure1
- Disconnect the G102 integration control supply (integrated capacitor) connector.
- Disconnect the 9C power distribution box assembly connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G102-10 (BUE2) - 9C-27 Always Below 1 Ω G102-10 (BUE2) or 9C-27 - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Connect the power distribution box assembly connector.
- Connect the integration control supply (integrated capacitor) connector.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 11
- INSPECT POWER DISTRIBUTION BOX ASSEMBLY
Pre-procedure1
- Remove the main body ECU (multiplex network body ECU) from the power distribution box assembly.
Refer to REMOVAL [11/2021 - ]
Procedure1
- Measure the resistance according to the value(s) in the table below.
*a Component without harness connected
(Power Distribution Box Assembly)- - Standard Resistance
Tester Connection Condition Specified Condition 9C-27 - MB-25 (SBAT) Always Below 1 Ω 9C-27 or MB-25 (SBAT) - Other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Install the main body ECU (multiplex network body ECU) to the power distribution box assembly.
Result:
NG
REPLACE POWER DISTRIBUTION BOX ASSEMBLY. Refer to REMOVAL [11/2021 - ]
Result:
OK
See step 12
- Remove the main body ECU (multiplex network body ECU) from the power distribution box assembly.
- CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - FRONT DOOR LOCK WITH MOTOR ASSEMBLY LH)
Pre-procedure1
- Disconnect the G102 integration control supply (integrated capacitor) connector.
- Disconnect the E34 front door lock with motor assembly LH connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G102-20 (BUA2) - E34-3 (BUB1) Always Below 1 Ω G102-20 (BUA2) or E34-3 (BUB1) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Connect the front door lock with motor assembly LH connector.
- Connect the integration control supply (integrated capacitor) connector.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 13
- CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - FRONT DOOR LOCK WITH MOTOR ASSEMBLY RH)
Pre-procedure1
- Disconnect the G102 integration control supply (integrated capacitor) connector.
- Disconnect the E13 front door lock with motor assembly RH connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G102-20 (BUA2) - E13-3 (BUB2) Always Below 1 Ω G102-20 (BUA2) or E13-3 (BUB2) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Connect the front door lock with motor assembly RH connector.
- Connect the integration control supply (integrated capacitor) connector.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 14
- CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - REAR DOOR LOCK WITH MOTOR ASSEMBLY LH)
Pre-procedure1
- Disconnect the G102 integration control supply (integrated capacitor) connector.
- Disconnect the F23 rear door lock with motor assembly LH connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G102-20 (BUA2) - F23-3 (BUB4) Always Below 1 Ω G102-20 (BUA2) or F23-3 (BUB4) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Connect the rear door lock with motor assembly LH connector.
- Connect the integration control supply (integrated capacitor) connector.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 15
- CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - REAR DOOR LOCK WITH MOTOR ASSEMBLY RH)
Pre-procedure1
- Disconnect the G102 integration control supply (integrated capacitor) connector.
- Disconnect the F9 rear door lock with motor assembly RH connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G102-20 (BUA2) - F9-3 (BUB3) Always Below 1 Ω G102-20 (BUA2) or F9-3 (BUB3) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Connect the rear door lock with motor assembly RH connector.
- Connect the integration control supply (integrated capacitor) connector.
Result:
OK
REPLACE INTEGRATION CONTROL SUPPLY (INTEGRATED CAPACITOR). Refer to REMOVAL [11/2021 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- CHECK HARNESS AND CONNECTOR (BR TERMINAL INPUT VOLTAGE)
Pre-procedure1
- Disconnect the G102 integration control supply (integrated capacitor) connector.
- Turn the ignition switch to ON.
Procedure1
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition G102-14 (BR) - Body ground Ignition switch to ON 8 to 14 V Result
Proceed to OK NG Post-procedure1
- Turn the ignition switch off.
- Connect the integration control supply (integrated capacitor) connector.
Result:
NG
See step 19
Result:
OK
See step 17
- CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - SHIFT CONTROL ECU)
Pre-procedure1
- Disconnect the G102 integration control supply (integrated capacitor) connector.
- Disconnect the D39 transmission floor shift assembly (shift control ECU) connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G102-1 (BUSE) - D39-13 (BUB) Always Below 1 Ω G102-1 (BUSE) or D39-13 (BUB) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Connect the transmission floor shift assembly (shift control ECU) connector.
- Connect the integration control supply (integrated capacitor) connector.
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 18
- CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - SHIFT ACTUATOR ECU)
Pre-procedure1
- Disconnect the G102 integration control supply (integrated capacitor) connector.
- Disconnect the B77 shift control actuator assembly (shift actuator ECU) connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G102-19 (BUA) - B77-6 (MA2) Always Below 1 Ω G102-9 (BUAE) - B77-8 (BUB1) Always Below 1 Ω G102-19 (BUA) or B77-6 (MA2) - Body ground and other terminals Always 10 kΩ or higher G102-9 (BUAE) or B77-8 (BUB1) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Connect the shift control actuator assembly (shift actuator ECU) connector.
- Connect the integration control supply (integrated capacitor) connector.
Result:
OK
REPLACE INTEGRATION CONTROL SUPPLY (INTEGRATED CAPACITOR). Refer to REMOVAL [11/2021 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- CHECK HARNESS AND CONNECTOR (INTEGRATED CAPACITOR - SHIFT CONTROL ECU)
Pre-procedure1
- Disconnect the G102 integration control supply (integrated capacitor) connector.
- Disconnect the D39 transmission floor shift assembly (shift control ECU) connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G102-14 (BR) - D39-20 (BUBO) Always Below 1 Ω G102-14 (BR) or D39-20 (BUBO) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG Post-procedure1
- Connect the transmission floor shift assembly (shift control ECU) connector.
- Connect the integration control supply (integrated capacitor) connector.
Result:
OK
REPLACE TRANSMISSION FLOOR SHIFT ASSEMBLY (SHIFT CONTROL ECU). Refer to REMOVAL [11/2021 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR