LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2024 >> NX 250 FWD >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine Intake / Exhaust System - Service Information >> Exhaust Manifold >> Installation [11/2021 - 03/2022] >> Procedure

Installation [11/2021 - 03/2022]: Procedure

  1. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR 

    Torque: 11 N.m (112 kgf/cm, 8 ft.lbf) 

  2. INSTALL EXHAUST MANIFOLD TO HEAD GASKET 
  3. INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst) 
    1. Fig 1: Exhaust Manifold Nuts Tightening Sequence (TWC: Front Catalyst)
      GTY1079358Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 Exhaust Manifold (TWC: Front Catalyst) *2 No. 1 Exhaust Manifold Heat Insulator
      *3 No. 1 Front Floor Heat Insulator - -
      1. Temporarily install the exhaust manifold (TWC: Front Catalyst), No. 1 exhaust manifold heat insulator and No. 1 front floor heat insulator.

        HINT: 

        At this time, do not install the parts with bolts or nuts.

      2. Temporarily install the exhaust manifold (TWC: Front Catalyst) to the cylinder head sub-assembly with 7 new nuts.
      3. Tighten the 7 nuts in the order shown in the illustration.

        Torque: 26 N.m (265 kgf/cm, 19 ft.lbf) 

  4. INSTALL MANIFOLD STAY 
    1. Fig 2: Manifold Stay Bolt And Nut Tightening Sequenc
      GTY1079755Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the manifold stay to the exhaust manifold (TWC: Front Catalyst) and cylinder block sub-assembly with the bolt and nut.
      2. Tighten the bolt and nut in the order shown in the illustration.

        Torque: 43 N.m (438 kgf/cm, 32 ft.lbf) 

  5. INSTALL NO. 1 FRONT FLOOR HEAT INSULATOR 

    Torque: 4.9 N.m (50 kgf/cm, 43 in.lbf) 

  6. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR 

    Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

  7. INSTALL WIRING HARNESS CLAMP BRACKET 

    Torque: 13 N.m (133 kgf/cm, 10 ft.lbf) 

  8. INSTALL AIR FUEL RATIO SENSOR (for Sensor 1) 
    Refer to INSTALLATION [11/2021 - ]
  9. INSTALL COWL VENTILATOR PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 17

  10. INSTALL COWL VENTILATOR SPLASH SHIELD LH 
  11. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY 

    Refer to INSTALLATION [11/2021 - ]

  12. INSTALL HOOD TO FRONT FENDER SEAL RH 
  13. INSTALL HOOD TO FRONT FENDER SEAL LH 
  14. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst) 

    Torque: 43 N.m (438 kgf/cm, 32 ft.lbf) 

  15. INSPECT FOR EXHAUST GAS LEAK 

    Refer to INITIALIZATION [11/2021 - ]

  16. INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY 

    Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf)