Installation [11/2021 - ]: Procedure
- INSTALL OIL CONTROL VALVE FILTER (w/ Filter)
- INSTALL OIL COOLER GASKET
- INSTALL OIL COOLER ASSEMBLY
Torque: 16 N.m (163 kgf/cm, 12 ft.lbf)
- CONNECT NO. 2 WATER BY-PASS HOSE
- CONNECT NO. 1 WATER BY-PASS HOSE
- ADD ENGINE OIL
Refer to PROCEDURE - Step 5 [11/2021 - 03/2023] , or refer to PROCEDURE - Step 5 [03/2023 - ]
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 5
- INSPECT FOR ENGINE OIL LEAK
Refer to PROCEDURE - Step 6 [11/2021 - 03/2023] , or refer to PROCEDURE - Step 6 [03/2023 - ]
- CHECK ENGINE OIL LEVEL
Refer to PROCEDURE - Step 1 [11/2021 - 03/2024] , or refer to PROCEDURE - Step 1 [03/2024 - ]
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 72
- INSTALL NO. 1 ENGINE UNDER COVER
Refer to PROCEDURE - Step 73
- INSTALL FRONT FENDER FRONT SPLASH SHIELD LH
- INSTALL FRONT FENDER FRONT SPLASH SHIELD RH