Inspection [11/2021 - ]: Procedure
- INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY
- Check the switch.
*a Component without harness connected
(Integration Control and Panel Assembly)- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 6 (B) - 2 (L) Pushed (ON) Below 1 Ω 6 (B) - 2 (L) Not Pushed (OFF) 10 kΩ or higher If the result is not as specified, replace the integration control and panel assembly.
- Measure the resistance according to the value(s) in the table below.
- Check the switch illumination.
- Apply auxiliary battery voltage to the switch connector and check that the integration control and panel assembly illuminates.
OK
Auxiliary Battery Condition Specified Condition Auxiliary battery positive (+) → Terminal 4 (ILL+)
Auxiliary battery negative (-) → Terminal 5 (ILL-)Illumination illuminates If the result is not as specified, replace the integration control and panel assembly.
- Apply auxiliary battery voltage to the switch connector and check that the integration control and panel assembly illuminates.
- Check the switch.