Installation [12/2021 - ]: Procedure
- INSTALL OIL COOLER O-RING
- INSTALL OIL COOLER GASKET
- INSTALL OIL COOLER ASSEMBLY
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- INSTALL IDLER PULLEY SUB-ASSEMBLY
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- INSTALL OIL FILTER RECEIVER
- INSTALL OIL FILTER SUB-ASSEMBLY
Refer to PROCEDURE - Step 6
- INSTALL NO. 1 V BELT (COOLER COMPRESSOR TO CRANKSHAFT PULLEY)
Refer to INSTALLATION [12/2021 - ]
- ADD ENGINE OIL
Refer to PROCEDURE - Step 7
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 3
- INSPECT ENGINE OIL LEVEL
Refer to PROCEDURE - Step 1
- INSPECT FOR OIL LEAK
Refer to PROCEDURE - Step 10
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 3
- INSTALL NO. 2 ENGINE UNDER COVER SEAL
Refer to PROCEDURE - Step 11
- INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
See step 7