Inspection [12/2023 - ]: Procedure
- INSPECT FUEL LID LOCK CONTROL CABLE SUB-ASSEMBLY
*a Switch On Area *b Switch Off Area *c Component without harness connected
(Fuel Lid Lock Control Cable Sub-assembly (Fuel Lid Open Sensor))Inspect the fuel lid lock control cable sub-assembly.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition L1-2 (B) - L1-1 (E) Switch On Below 1 Ω L1-2 (B) - L1-1 (E) Switch Off 10 kΩ or higher If the result is not as specified, replace the fuel lid lock control cable sub-assembly.
- Measure the resistance according to the value(s) in the table below.