Installation [06/2018 - 08/2021]: Procedure
- INSTALL HEADUP DISPLAY SWITCH (NO. 2 COMBINATION SWITCH ASSEMBLY)
- INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY
Refer to PROCEDURE - Step 39
- INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 40
- INSTALL INSTRUMENT SIDE PANEL LH
Refer to PROCEDURE - Step 41
- INSTALL FRONT DOOR OPENING TRIM COVER LH
Refer to PROCEDURE - Step 31
- INSTALL COWL SIDE TRIM BOARD LH
Refer to PROCEDURE - Step 32
- INSTALL FRONT DOOR SCUFF PLATE LH
Refer to PROCEDURE - Step 33