LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2023 >> LS 500h >> Repair and Diagnosis >> Brakes >> Parking Brake System >> Electric Parking Brake System - Service Information >> Electric Parking Brake Actuator >> Installation [10/2017 - ] >> Procedure

Installation [10/2017 - ]: Procedure

  1. INSTALL NO. 1 ACTUATOR HARNESS CLAMP 
    1. Connect the No. 1 actuator harness clamp with the 2 clamps.
      GTY812917Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL NO. 2 ACTUATOR HARNESS CLAMP 
    1. Connect the No. 2 actuator harness clamp with the clamp.
      GTY812919Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL NO. 1 CABLE SUPPORT BRACKET 
    1. Install the No. 1 cable support bracket in the direction indicated by the arrow shown in the illustration.
      GTY812918Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. INSTALL NO. 2 CABLE SUPPORT BRACKET 
    1. Install the No. 2 cable support bracket in the direction indicated by the arrow shown in the illustration.
      GTY812928Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  5. INSTALL CABLE SUPPORT BRACKET 
    1. Install the parking brake cable support bracket in the direction indicated by the arrow shown in the illustration.
      GTY812926Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  6. INSTALL PARKING BRAKE ACTUATOR ASSEMBLY WITH BRACKET 
    1. Install the parking brake actuator assembly with bracket with the 3 nuts.

      Torque: 27 N.m (275 kgf/cm, 20 ft.lbf) 

      GTY812724Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. connect the 2 clamps to the rear suspension member sub-assembly.
      GTY812306Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the parking brake actuator assembly with bracket with the bolt and 6 nuts.

      Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf) 

      GTY812726Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  7. INSTALL REAR SUSPENSION MEMBER SUB-ASSEMBLY 

    Refer to INSTALLATION [10/2017 - 09/2019] , or refer to INSTALLATION [09/2019 - 10/2020] , or refer to INSTALLATION [10/2020 - 10/2023] , or refer to INSTALLATION [10/2023 - ]