Installation [06/2018 - 08/2021]: Procedure
- INSTALL AIR CONDITIONING CONTROL ASSEMBLY
- INSTALL NO. 2 INSTRUMENT CLUSTER MOULDING
Refer to PROCEDURE - Step 25
- INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY
Refer to PROCEDURE - Step 28
- INSTALL INSTRUMENT SIDE PANEL RH
Refer to PROCEDURE - Step 32
- INSTALL FRONT DOOR OPENING TRIM COVER RH
HINT:
Use the same procedure as for the LH side.
Refer to PROCEDURE - Step 42
- INSTALL COWL SIDE TRIM BOARD RH
HINT:
Use the same procedure as for the LH side.
Refer to PROCEDURE - Step 32
- INSTALL FRONT DOOR SCUFF PLATE RH
HINT:
Use the same procedure as for the LH side.
Refer to PROCEDURE - Step 33