Installation [10/2018 - ]: Procedure
- INSTALL METER MIRROR SUB-ASSEMBLY
- Engage the clip as shown in the illustration.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Install in this Direction - Temporarily install the meter mirror sub-assembly with the 3 nuts.
- Tighten the 3 nuts in the order shown in the illustration.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Connect the connector.
- Engage the clip as shown in the illustration.
- INSTALL INSTRUMENT PANEL SAFETY PAD ASSEMBLY
Refer to INSTALLATION [10/2018 - 08/2021] , or refer to INSTALLATION [08/2021 - 07/2022] , or refer to INSTALLATION [07/2022 - ]