Inspection [10/2015 - ]: Procedure
- INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY (AUTOMATIC HIGH BEAM SWITCH)
- Measure the resistance according to the value(s) in the table below.
*a Component without harness connected
(Integration Control and Panel Assembly (Automatic High Beam Switch))Standard Resistance
Tester Connection Condition Specified Condition 1 (+B) - 10 (E) Integration control and panel assembly (automatic high beam switch) off 1 MΩ or higher Integration control and panel assembly (automatic high beam switch) on Below 100 Ω If the result is not as specified, replace the integration control and panel assembly (automatic high beam switch).
- Illumination Inspection
- Apply auxiliary battery voltage to the integration control and panel assembly (automatic high beam switch) off and check that the switch illuminates.
OK
Condition Specified Condition Auxiliary battery positive (+) → Terminal 7 (ILL+)
Auxiliary battery negative (-) → Terminal 12 (ILL-)Illuminates If the result is not as specified, replace the integration control and panel assembly (automatic high beam switch).
- Apply auxiliary battery voltage to the integration control and panel assembly (automatic high beam switch) off and check that the switch illuminates.
- Measure the resistance according to the value(s) in the table below.