Installation [09/2015 - ]: Procedure
- INSTALL TRANSMISSION VALVE BODY ASSEMBLY
- Connect the manual valve connecting rod to the manual valve lever sub-assembly.
- Install the transmission valve body assembly to the automatic transaxle case sub-assembly with the 8 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
HINT:
Bolt Length
- Bolt (A): 31 mm (1.22 in.)
- Bolt (B): 21 mm (0.827 in.)
- Bolt (C): 51 mm (2.01 in.)
- Engage the clamp and guide to connect the transmission revolution sensor (NC) wire.
- Coat the O-ring of the temperature sensor with ATF.
- Connect the temperature sensor and install the temperature sensor clamp to the transmission valve body assembly with the bolt.
Torque: 7.0 N*m (71 kgf*cm, 62 in.*lbf)
- Connect the 9 shift solenoid valve connectors.
- Connect the transmission revolution sensor (NT) connector and transmission revolution sensor (NC) connector.
*a Transmission Revolution Sensor (NT) Connector *b Transmission Revolution Sensor (NC) Connector *c Bend wire harness toward automatic transaxle case sub-assembly NOTE:Be sure to bend the wire harness toward the automatic transaxle case sub-assembly. If the wire harness is positioned close to the transmission valve body assembly, it may interfere with the manual valve connecting rod.
- Connect the manual valve connecting rod to the manual valve lever sub-assembly.
- INSTALL TRANSAXLE SIDE COVER SUB-ASSEMBLY
- Remove any remaining seal packing from the sealing surface of the automatic transaxle case sub-assembly.NOTE:
Make sure that there is no ATF on the sealing surface.
- Clean the 13 bolts and bolt holes in the automatic transaxle case sub-assembly.
- Temporarily install 2 stud bolts to the automatic transaxle case sub-assembly by hand, to the positions shown in the illustration.
Item Part Number Stud Bolt 92122-80825 - Apply FIPG to a new transaxle side cover sub-assembly.
*a FIPG FIPG
Toyota Genuine Seal Packing 1281 Three Bond 1281 or equivalent
NOTE:- Apply FIPG in a continuous line (width 2.5 mm (0.0984 in.)) along the sealing surface.
- After applying FIPG, install the transaxle side cover sub-assembly to the automatic transaxle case sub-assembly within 3 minutes and tighten the bolts within 20 minutes.
- Apply adhesive to 2 or 3 threads on the ends of the 13 bolts.
*a Adhesive Adhesive
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
NOTE:Make sure to install the bolts immediately after applying adhesive to prevent foreign matter from attaching to them.
- Using a T40 "TORX" socket wrench, install the transaxle side cover sub-assembly to the automatic transaxle case sub-assembly with the 11 bolts.
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
*a Stud Bolt - Remove the 2 stud bolts.
- Using a T40 "TORX" socket wrench, install the 2 bolts.
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
- Remove any remaining seal packing from the sealing surface of the automatic transaxle case sub-assembly.
- INSTALL INLET NO. 1 OIL COOLER TUBE SUB-ASSEMBLY
- Coat a new O-ring with ATF and install it to the inlet No. 1 oil cooler tube sub-assembly.NOTE:
Ensure that the O-ring is not twisted.
- Install the inlet No. 1 oil cooler tube sub-assembly to the transaxle housing.NOTE:
The installation bolts will be installed after installing the outlet No. 1 oil cooler tube sub-assembly.
- Coat a new O-ring with ATF and install it to the inlet No. 1 oil cooler tube sub-assembly.
- INSTALL OUTLET NO. 1 OIL COOLER TUBE SUB-ASSEMBLY
- Coat a new O-ring with ATF and install it to the outlet No. 1 oil cooler tube sub-assembly.NOTE:
Ensure that the O-ring is not twisted.
- Install the outlet No. 1 oil cooler tube sub-assembly to the transaxle housing.
- Temporarily install the 4 bolts in the order shown in the illustration.
- Fully tighten the 4 bolts in the order shown in the illustration.
Torque: 25 N*m (255 kgf*cm, 18 ft.*lbf)
- Coat a new O-ring with ATF and install it to the outlet No. 1 oil cooler tube sub-assembly.
- CONNECT NO. 1 TRANSMISSION OIL COOLER HOSE ASSEMBLY
- Connect the 2 No. 1 transmission oil cooler hose assemblies and slide the 2 clips to secure them.
- INSTALL FRONT ENGINE MOUNTING INSULATOR
Refer to PROCEDURE - Step 1
- INSTALL FRONT FRAME ASSEMBLY
Refer to INSTALLATION [09/2015 - 08/2016] , or refer to INSTALLATION [08/2016 - 08/2019] , or refer to INSTALLATION [08/2019 - ]
- ADJUST AUTOMATIC TRANSAXLE FLUID
Refer to ADJUSTMENT [09/2015 - 08/2019] , or refer to ADJUSTMENT [08/2019 - ]
- INSTALL FRONT FENDER APRON SEAL LH
Refer to PROCEDURE - Step 64 [09/2015 - 08/2016] , or refer to PROCEDURE - Step 64 [08/2016 - 12/2017] , or refer to PROCEDURE - Step 64 [12/2017 - 08/2019] , or refer to PROCEDURE - Step 64 [08/2019 - ]
- INSTALL NO. 3 ENGINE UNDER COVER
Refer to PROCEDURE - Step 69 [09/2015 - 08/2016] , or refer to PROCEDURE - Step 69 [08/2016 - 12/2017] , or refer to PROCEDURE - Step 69 [12/2017 - 08/2019] , or refer to PROCEDURE - Step 71 [08/2019 - ]
- INSTALL FRONT WHEEL OPENING EXTENSION PAD LH
Refer to PROCEDURE - Step 70 [09/2015 - 08/2016] , or refer to PROCEDURE - Step 70 [08/2016 - 12/2017] , or refer to PROCEDURE - Step 70 [12/2017 - 08/2019] , or refer to PROCEDURE - Step 72 [08/2019 - ]
- INSTALL FRONT WHEEL LH
Refer to PROCEDURE - Step 1