Installation [09/2015 - 07/2020]: Procedure
WARNING: This page is about a different variant/trim than selected.
- INSTALL NO. 1 SWITCH WIRE
HINT:
Perform this procedure only when replacement of the No. 1 switch wire is necessary.
- Engage the 6 clamps to install the No. 1 switch wire to the steering wheel assembly.
- Engage the 2 guides.
- Connect the steering vibration and heater ECU connector.
- INSTALL SHIFT PADDLE SWITCH (TRANSMISSION SHIFT SWITCH ASSEMBLY)
- Connect the 2 shift paddle switch (transmission shift switch assembly) connectors.
- Engage the 2 claws to install the 2 shift paddle switches (transmission shift switch assemblies) to the steering wheel assembly.
- Install 2 new screws.
Torque: 1.7 N*m (17 kgf*cm, 15 in.*lbf)
- INSTALL LOWER NO. 1 STEERING WHEEL BOSS COVER
- Engage the 2 claws to install the 2 lower No. 1 steering wheel boss covers to the steering wheel assembly.
- Install 2 new screws.
Torque: 1.7 N*m (17 kgf*cm, 15 in.*lbf)
- INSTALL STEERING PAD SWITCH ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL CRUISE CONTROL MAIN SWITCH
Refer to PROCEDURE - Step 1
- INSTALL STEERING WHEEL ASSEMBLY
Refer to INSTALLATION [09/2015 - 08/2016] , or refer to INSTALLATION [08/2016 - 08/2019] , or refer to INSTALLATION [08/2019 - 07/2020]