LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2022 >> NX 450h+ Base >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge System - Diagnostic Codes & Circuit Tests >> Meter / Gauge System >> DTC B1500-13: Fuel Sender Circuit Open [11/2021 - 03/2024] >> Procedure

DTC B1500-13: Fuel Sender Circuit Open [11/2021 - 03/2024]: Procedure

  1. READ VALUE USING GTS 
    1. Read the Data List according to the display on the GTS.

      Body Electrical > Combination Meter > Data List 

      Tester Display Measurement Item Range Normal Condition Diagnostic Note
      Fuel Input Fuel level input Min.: 0.00 L, Max.: 655.35 L or Unset See [Normal Condition 1] The detected value of the fuel sender gauge assembly is displayed.

      HINT: 

      [Normal Condition 1]: Fuel Input 

      1. GTY1068728Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
        *a Fuel Receiver Gauge
        *b Segments

        Refer to the following table to find the approximate indicated value of the fuel receiver gauge based on the value of the Data List item:

        Data List: Fuel Input (L) Fuel Receiver Gauge Indication
        46.0 or more Segments illuminate 8/8
        40.3 to 46.0 Segments illuminate 7/8
        34.5 to 40.3 Segments illuminate 6/8
        28.7 to 34.5 Segments illuminate 5/8
        22.9 to 28.7 Segments illuminate 4/8
        17.1 to 22.9 Segments illuminate 3/8
        11.3 to 17.1 Segments illuminate 2/8
        5.5 to 11.3 Segments illuminate 1/8
        below 5.5 Segments illuminate 0/8

      Body Electrical > Combination Meter > Data List 

      Tester Display
      Fuel Input

      Result

      Result Proceed to
      Fuel level data can be displayed on the GTS A
      Fuel level data cannot be displayed on the GTS B

    Result: 

    REPLACE COMBINATION METER ASSEMBLY. Refer to  REMOVAL [11/2021 - ] 

    Result: 

    See step  2

  2. INSPECT FUEL SENDER GAUGE ASSEMBLY 

    Refer to INSPECTION [11/2021 - 03/2024]

    Result

    Proceed to
    OK
    NG

    Result: 

    NG 

    REPLACE FUEL SENDER GAUGE ASSEMBLY. Refer to  REMOVAL [11/2021 - 03/2024] 

    Result: 

    OK 

    See step  3

  3. INSPECT FUEL SUCTION TUBE WITH PUMP AND GAUGE ASSEMBLY 
    1. Measure the resistance according to the value(s) in the table below.
      GTY1067718Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Fuel Suction Tube with Pump and Gauge Assembly)

      Standard Resistance

      Tester Connection Condition Specified Condition
      G118-1 (FV) - A-3 Always Below 1 Ω
      G118-2 (FE) - A-2 Always Below 1 Ω
      G118-3 (FR) - A-1 Always Below 1 Ω
      G118-1 (FV) - G118-2 (FE)
      or
      A-3 - A-2
      Always 10 kΩ or higher
      G118-1 (FV) - G118-3 (FR)
      or
      A-3 - A-1
      Always 10 kΩ or higher
      G118-2 (FE) - G118-3 (FR)
      or
      A-2 - A-1
      Always 10 kΩ or higher

      Result

      Proceed to
      OK
      NG

    Result: 

    NG 

    REPLACE FUEL SUCTION TUBE WITH PUMP AND GAUGE ASSEMBLY. Refer to  REMOVAL [11/2021 - 03/2024] 

    Result: 

    OK 

    See step  4

  4. CHECK HARNESS AND CONNECTOR (FUEL SUCTION TUBE WITH PUMP AND GAUGE ASSEMBLY - COMBINATION METER ASSEMBLY) 

    Pre-procedure1

    1. Disconnect the D22 combination meter assembly connector.

      Procedure1

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      G118-3 (FR) - D22-7 (FR) Always Below 1 Ω
      G118-2 (FE) - D22-25 (FE&B) Always Below 1 Ω
      G118-1 (FV) - D22-23 (FV) Always Below 1 Ω
      G118-3 (FR) or D22-7 (FR) - Body ground Always 10 kΩ or higher
      G118-1 (FV) or D22-23 (FV) - Body ground Always 10 kΩ or higher

      Result

      Proceed to
      OK
      NG

      Post-procedure1

    3. None

    Result: 

    OK 

    REPLACE COMBINATION METER ASSEMBLY. Refer to  REMOVAL [11/2021 - ] 

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR