  1. INSTALL METER MIRROR SUB-ASSEMBLY 
    1. Fig 1: Meter Mirror Sub-Assembly Bolts Tightening Sequence
      GTY1068775Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Connect the 2 connectors.
      2. Install the meter mirror sub-assembly with the 3 bolts.

        HINT: 

        Install the bolts in the order shown in the illustration.

        Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

  2. INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY 

    Refer to INSTALLATION [11/2021 - ]