LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2022 >> LX 600 Base >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge System - Diagnostic Codes & Symptom Tests >> Meter / Gauge System >> DTC B1500-13: Fuel Sender Circuit Open [12/2021 - ] >> Procedure

DTC B1500-13: Fuel Sender Circuit Open [12/2021 - ]: Procedure

  1. INSPECT FUEL SENDER GAUGE ASSEMBLY 

    for Single Tank Type: Refer to INSPECTION [12/2021 - ]

    for Double Tank Type: Refer to INSPECTION [12/2021 - ]

    Result

    Proceed to
    OK
    NG

    Result: 

    NG 

    REPLACE FUEL SENDER GAUGE ASSEMBLY 

    for Single Tank Type: Refer to REMOVAL [12/2021 - ]

    for Double Tank Type: Refer to INSPECTION [12/2021 - ]

    Result: 

    OK 

    See step  2

  2. INSPECT FUEL SUCTION WITH PUMP AND GAUGE TUBE ASSEMBLY 

    Pre-procedure1

    GTY1040176Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Remove the fuel suction with pump and gauge tube assembly.

      for Single Tank Type: Refer to REMOVAL [12/2021 - ]

      for Double Tank Type: Refer to REMOVAL [12/2021 - ]

      Procedure1

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      A-1 (FV) - B-1 Always Below 1 Ω
      A-2 (FE) - B-2 Always Below 1 Ω
      A-3 (FR) - B-3 Always Below 1 Ω

      Result

      Proceed to
      OK
      NG

      Post-procedure1

    3. None

    Result: 

    NG 

    REPLACE FUEL SUCTION WITH PUMP AND GAUGE TUBE ASSEMBLY 

    for Single Tank Type: Refer to REMOVAL [12/2021 - ]

    for Double Tank Type: Refer to REMOVAL [12/2021 - ]

    Result: 

    OK 

    See step  3

  3. CHECK HARNESS AND CONNECTOR (FUEL SUCTION WITH PUMP AND GAUGE TUBE ASSEMBLY - COMBINATION METER ASSEMBLY) 

    Pre-procedure1

    1. Disconnect the V8 fuel suction with pump and gauge tube assembly connector.
    2. Disconnect the I5 combination meter assembly connector.

      Procedure1

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      V8-3 (FR) - I5-23 (FR) Always Below 1 Ω
      V8-2 (FE) - I5-17 (FE&B) Always Below 1 Ω
      V8-1 (FV) - I5-7 (FV) Always Below 1 Ω
      V8-3 (FR) or I5-23 (FR) - Other terminals and body ground Always 10 kΩ or higher
      V8-2 (FE) or I5-17 (FE&B) - Other terminals and body ground Always 10 kΩ or higher
      V8-1 (FV) or I5-7 (FV) - Other terminals and body ground Always 10 kΩ or higher

      Result

      Proceed to
      OK
      NG

      Post-procedure1

    4. None

    Result: 

    OK 

    REPLACE COMBINATION METER ASSEMBLY. Refer to  REMOVAL [12/2021 - ] 

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR