Motor Generator Control ECU Communication Stop Mode [10/2018 - ]: Procedure
- CHECK FOR OPEN IN CAN BUS LINES (INVERTER WITH CONVERTER ASSEMBLY BRANCH LINE)
- Disconnect the cable from the negative (-) auxiliary battery terminal.
- Disconnect the inverter with converter assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition C41-1 (CANH) - C41-7 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 54 to 69 Ω *a Front view of wire harness connector
(to Inverter with Converter Assembly)Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE CAN BRANCH LINES OR CONNECTOR (INVERTER WITH CONVERTER ASSEMBLY)
Result:
OK
See step 2
- CHECK HARNESS AND CONNECTOR (POWER SOURCE CIRCUIT)
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition C41-23 (GND2) - Body ground Cable disconnected from negative (-) auxiliary battery terminal Below 1 Ω C41-24 (GND1) - Body ground Cable disconnected from negative (-) auxiliary battery terminal Below 1 Ω *a Front view of wire harness connector
(to Inverter with Converter Assembly) - Reconnect the cable to the negative (-) auxiliary battery terminal.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition C41-5 (+B2) - Body ground Power switch on (IG) 11 to 14 V C41-6 (+B) - Body ground Power switch on (IG) 11 to 14 V C41-12 (IGCT) - Body ground Power switch on (IG) 11 to 14 V Result
Proceed to OK NG
Result:
OK
REPLACE MG ECU (REPLACE INVERTER WITH CONVERTER ASSEMBLY)
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (POWER SOURCE CIRCUIT)
- Measure the resistance according to the value(s) in the table below.