Installation [09/2015 - ]: Procedure
- INSTALL TRANSFER ASSEMBLY
- Install the transfer assembly with the 8 bolts.
Torque: 40 N*m (408 kgf*cm, 30 ft.*lbf)
NOTE:Take care not to damage the adaptor oil seal with the transfer input shaft spline.
- Install the bracket with the bolt.
Torque: 29 N*m (296 kgf*cm, 21 ft.*lbf)
- Attach the 2 clamps.
- w/ Temperature Sensor:
Connect the 3 connectors and attach the 3 clamps.
- w/o Temperature Sensor:
Connect the 2 connectors and attach the 3 clamps.
- Connect the transfer breather hose sub-assembly and attach the 2 clamps.
- Install the transfer assembly with the 8 bolts.
- INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR
Refer to PROCEDURE - Step 7
- INSTALL NO. 2 FRAME CROSSMEMBER SUB-ASSEMBLY
Refer to PROCEDURE - Step 8
- INSTALL GROUND WIRE
- Install the ground wire with the 2 bolts.
for Transfer Side
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
for Vehicle Side:
for Type A
Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf)
for Type B
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
HINT:
Type A or B can be distinguished by confirming the mark on the bolt.
* A for Type A * B for Type B
- Install the ground wire with the 2 bolts.
- CONNECT OIL COOLER TUBE
Refer to PROCEDURE - Step 10
- INSTALL FRONT EXHAUST PIPE ASSEMBLY
Refer to INSTALLATION [09/2015 - ]
- INSTALL PROPELLER SHAFT ASSEMBLY
Refer to INSTALLATION [09/2015 - ]
- INSTALL FRONT PROPELLER SHAFT ASSEMBLY
Refer to INSTALLATION [09/2015 - ]
- CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
Refer to PROCEDURE - Step 14
- INSTALL OIL PAN PROTECTOR ASSEMBLY
Refer to PROCEDURE - Step 31
- ADD TRANSFER OIL
See step 2)
- CHECK FOR TRANSFER OIL LEAK
- INSTALL NO. 2 ENGINE UNDER COVER
Refer to PROCEDURE - Step 18
- INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 19
- INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
Refer to PROCEDURE - Step 15
- INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
Refer to PROCEDURE - Step 16