Installation [09/2015 - ]: Procedure
- INSTALL GENERATOR ASSEMBLY
- Install the stud bolt to the cylinder block.
Torque: 10 N*m (02 kgf*cm, 7 ft.*lbf)
- Install the generator assembly with the 3 bolts and nut.
Torque: 43 N*m (38 kgf*cm, 32 ft.*lbf)
- Install the wire harness clamp bracket to the generator assembly with the bolt.
Torque: 31 N*m (16 kgf*cm, 23 ft.*lbf)
- Attach the clamp and connect the generator wire.
- Connect the generator wire to terminal B with the nut.
Torque: 12 N*m (22 kgf*cm, 9 ft.*lbf)
- Install the terminal cap.
- Connect the generator connector.
- Install the stud bolt to the cylinder block.
- CONNECT OIL COOLER TUBE
Refer to PROCEDURE - Step 7
- CONNECT VANE PUMP ASSEMBLY
Refer to PROCEDURE - Step 21
- INSTALL AIR CLEANER ASSEMBLY
Refer to PROCEDURE - Step 37
- INSTALL AIR CLEANER HOSE ASSEMBLY
Refer to PROCEDURE - Step 10
- INSTALL FAN AND GENERATOR V BELT
Refer to PROCEDURE - Step 1
- INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 19
- INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
Refer to PROCEDURE - Step 15
- INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
Refer to PROCEDURE - Step 16
- INSTALL FRONT FENDER APRON TRIM PACKING A
Refer to PROCEDURE - Step 16
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 69
- INSTALL UPPER RADIATOR SUPPORT SEAL
Refer to PROCEDURE - Step 14
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [09/2015 - 08/2019] Refer to INITIALIZATION [08/2019 - ] ).