DTC C13A1: Short Circuit in Power Source Circuit [10/2020 - 10/2023]: Procedure
- CHECK HARNESS AND CONNECTOR (PARKING BRAKE ECU ASSEMBLY - IG POWER SOURCE CIRCUIT)
- Turn the power switch off.
- Disconnect the parking brake ECU assembly connector.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition L77-4 (IG) - Body ground Power switch off Below 2.5 V Result
Proceed to OK NG
Result:
NG
REPAIR IG POWER SOURCE CIRCUIT
Result:
OK
See step 2
- INSPECT ELECTRIC PARKING BRAKE SWITCH ASSEMBLY
- Inspect the electric parking brake switch assembly.
Refer to INSPECTION [10/2020 - 10/2023]
Result
Proceed to OK NG
Result:
NG
REPLACE ELECTRIC PARKING BRAKE SWITCH ASSEMBLY. Refer to REMOVAL [10/2017 - ]
Result:
OK
See step 3
- Inspect the electric parking brake switch assembly.
- CHECK HARNESS AND CONNECTOR (PARKING BRAKE ECU ASSEMBLY - ELECTRIC PARKING BRAKE SWITCH ASSEMBLY)
- Turn the power switch off.
- Disconnect the G43 electric parking brake switch assembly connector.
- Disconnect the parking brake ECU assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition L77-12 (LCK1) - Body ground Always 10 kΩ or higher L77-13 (REL2) - Body ground Always 10 kΩ or higher L77-15 (LCK2) - Body ground Always 10 kΩ or higher L77-16 (REL1) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
OK
REPLACE PARKING BRAKE ECU ASSEMBLY. Refer to REMOVAL [10/2020 - 11/2021] , or refer to REMOVAL [11/2021 - 10/2022] , or refer to REMOVAL [10/2022 - 10/2023]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR