Installation [05/2023 - ]: Procedure
- INSTALL METER MIRROR SUB-ASSEMBLY
- INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
Refer to INSTALLATION [05/2023 - ]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to PROCEDURE - Step 2
- INSTALL NO. 2 DECK BOARD
Refer to PROCEDURE - Step 13
- INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
HINT:
When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function that completes learning when the respective system is used.
- CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM
Refer to PROCEDURE - Step 18
- CHECK SRS WARNING LIGHT
Refer to OPERATION CHECK [04/2020 - ]