Installation [07/2020 - 05/2023]: Procedure
- INSTALL CLOCK ASSEMBLY
- INSTALL MULTI-DISPLAY
Refer to INSTALLATION [07/2020 - 05/2023]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to INSTALLATION [07/2020 - 05/2023]
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [07/2020 - 05/2023]
- CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM
Refer to PROCEDURE - Step 23