Installation [06/2018 - ]: Procedure
- INSTALL STARTER ASSEMBLY
- Install the starter assembly with the 2 bolts.
Torque: 46 N.m (469 kgf/cm, 34 ft.lbf)
- Connect the engine wire to the terminal 30 with the nut.
Torque: 9.8 N.m (100 kgf/cm, 87 in.lbf)
- Close the terminal cap.
- Connect the starter assembly connector.
- Install the starter assembly with the 2 bolts.
- INSTALL BATTERY CLAMP SUB-ASSEMBLY
Refer to PROCEDURE - Step 41
- INSTALL ECM
Refer to PROCEDURE - Step 3
- INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 45
- INSTALL INLET AIR CLEANER ASSEMBLY
Refer to PROCEDURE - Step 46
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 47
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 2 [06/2018 - 08/2021] , or refer to PROCEDURE - Step 2 [08/2021 - 09/2022] , or refer to PROCEDURE - Step 2 [09/2022 - ]
- INSTALL BATTERY
Refer to INSTALLATION [06/2018 - ]