Entire Combination Meter does not Operate [06/2018 - ]: Procedure
WARNING: This page does not describe the selected car, but rather 10 other vehicles, including the 2024 Lexus ES 350, 2024 Lexus ES 250, 2023 Lexus ES 350, 2023 Lexus ES 250, and 2022 Lexus ES 350. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK HARNESS AND CONNECTOR (POWER SOURCE CIRCUIT)
- Disconnect the G17 combination meter assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G17-31 (ES) - Body ground Always Below 1 Ω G17-40 (EP) - Body ground Always Below 1 Ω - Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition G17-21 (IG+) - Body ground Engine switch off Below 1 V Engine switch on (IG) 11 to 14 V G17-22 (B) - Body ground Always 11 to 14 V Result
Proceed to OK NG
Result:
OK
REPLACE COMBINATION METER ASSEMBLY. Refer to REMOVAL [06/2018 - 08/2021] , or refer to REMOVAL [08/2021 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR