Installation [08/2020 - ]: Procedure
- INSTALL GENERATOR ASSEMBLY
- Install the generator assembly with the bolt and 2 nuts.
Torque: 25 N.m (255 kgf/cm, 18 ft.lbf)
- Engage the clamp.
- Connect the E.F.I. vacuum sensor assembly (manifold absolute pressure sensor) connector.
- Install the wire harness clamp bracket to the generator assembly with the bolt.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Connect the wire harness to terminal B with the nut.
Torque: 9.8 N.m (100 kgf/cm, 87 in.lbf)
- Close the terminal cap.
- Connect the generator assembly connector.
- Install the generator assembly with the bolt and 2 nuts.
- INSTALL V-RIBBED BELT
Refer to INSTALLATION [08/2020 - ]
- INSTALL INLET AIR CLEANER ASSEMBLY
Refer to PROCEDURE - Step 47 [08/2020 - 08/2021] , or refer to PROCEDURE - Step 48 [08/2021 - ]
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 2 [06/2018 - 08/2021] , or refer to PROCEDURE - Step 2 [08/2021 - 09/2022] , or refer to PROCEDURE - Step 2 [09/2022 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2