Main Switch Circuit [10/2018 - 07/2022]: Procedure
- READ VALUE USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the ignition switch to ON.
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Head Up Display / Data List.
- Read the Data List according to the display on the Techstream.
Body Electrical > Head Up Display > Data List
Tester Display Measurement Item Range Normal Condition Diagnostic Note Main Switch Headup display switch (Integration control and panel assembly) OFF or ON OFF: Switch released
ON: Switch pushed- Body Electrical > Head Up Display > Data List
Tester Display Main Switch OK
Headup display switch (Integration control and panel assembly) condition displayed on the Techstream changes with the actual switch operation.
Result
Proceed to OK NG
Result:
OK
REPLACE METER MIRROR SUB-ASSEMBLY. Refer to REMOVAL [10/2018 - 07/2022]
Result:
NG
See step 2
- INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY
- Remove the integration control and panel assembly.
Refer to REMOVAL [10/2018 - ]
- Inspect the integration control and panel assembly.
Refer to INSPECTION [10/2018 - 07/2022]
Result
Proceed to OK NG
Result:
NG
REPLACE INTEGRATION CONTROL AND PANEL ASSEMBLY. Refer to REMOVAL [10/2018 - ]
Result:
OK
See step 3
- Remove the integration control and panel assembly.
- CHECK HARNESS AND CONNECTOR (INTEGRATION CONTROL AND PANEL ASSEMBLY - METER MIRROR SUB-ASSEMBLY AND BODY GROUND)
- Disconnect the F25 meter mirror sub-assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition F35-4 (ILU) - F25-9 (SW1) Always Below 1 Ω F35-14 (CH) - F25-16 (E) Always Below 1 Ω F35-4 (ILU) or F25-9 (SW1) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
OK
REPLACE METER MIRROR SUB-ASSEMBLY. Refer to REMOVAL [10/2018 - 07/2022]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR