Open in Bus 2 Main Bus Line [10/2018 - ]: Procedure
- CHECK FOR OPEN IN CAN MAIN BUS LINES (NO. 3 CAN JUNCTION CONNECTOR)
- Disconnect the cable from the negative (-) auxiliary battery terminal.
- Disconnect the No. 3 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 3 CAN Junction Connector)*b to No. 6 CAN Junction Connector *c to Central Gateway ECU (Network Gateway ECU) - - Standard Resistance
Tester Connection Condition Specified Condition Connected to F88-1 (CANH) - F88-7 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω No. 6 CAN junction connector F88-2 (CANH) - F88-8 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Central gateway ECU (network gateway ECU) Result
Result Proceed to OK A NG (Line to central gateway ECU (network gateway ECU)) B NG (Line to No. 6 CAN junction connector) C
Result:
A
REPLACE NO. 3 CAN JUNCTION CONNECTOR
Result:
C
See step 3
Result:
B
See step 2
- CHECK FOR OPEN IN CAN MAIN BUS LINES (CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU) - NO. 3 CAN JUNCTION CONNECTOR)
- Reconnect the F88 No. 3 CAN junction connector.
- Disconnect the central gateway ECU (network gateway ECU) connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to Central Gateway ECU (Network Gateway ECU))Standard Resistance
Tester Connection Condition Specified Condition F61-18 (CA4H) - F61-17 (CA4L) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Proceed to OK NG
Result:
OK
REPLACE CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU). Refer to REMOVAL [10/2018 - 07/2022] , or refer to REMOVAL [07/2022 - ]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU) - NO. 3 CAN JUNCTION CONNECTOR)
- CHECK FOR OPEN IN CAN MAIN BUS LINES (NO. 6 CAN JUNCTION CONNECTOR)
- Reconnect the F88 No. 3 CAN junction connector.
- Disconnect the No. 6 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 6 CAN Junction Connector)*b to No. 3 CAN Junction Connector *c to ECM - - Standard Resistance
Tester Connection Condition Specified Condition Connected to F93-9 (CANH) - F93-20 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω No. 3 CAN junction connector F93-10 (CANH) - F93-21 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω ECM Result
Result Proceed to OK A NG (Line to No. 3 CAN junction connector) B NG (Line to ECM assembly) C
Result:
A
REPLACE NO. 6 CAN JUNCTION CONNECTOR
Result:
B
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (NO. 3 CAN JUNCTION CONNECTOR - NO. 6 CAN JUNCTION CONNECTOR)
Result:
C
See step 4
- CHECK FOR OPEN IN CAN MAIN BUS LINES (ECM - NO. 6 CAN JUNCTION CONNECTOR)
- Reconnect the F93 No. 6 CAN junction connector.
- Disconnect the ECM connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to ECM)Standard Resistance
Tester Connection Condition Specified Condition A36-8 (CANH) - A36-18 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Proceed to OK NG
Result:
OK
REPLACE ECM. Refer to REMOVAL [10/2018 - 07/2022] , or refer to REMOVAL [07/2022 - ]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (ECM - NO. 6 CAN JUNCTION CONNECTOR)