Caution / Notice / Hint
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2024 Lexus UX 250h, 2023 Lexus UX 250h, 2022 Lexus UX 250h, 2021 Lexus UX 250h, and 2020 Lexus UX 250h. However, it is still accessible from the selected car via links, so may be relevant.
This step is referenced from the procedures for each DTC.
If the inspection results below are normal, perform the next procedure for the referenced DTC.
WARNING:
- Before the following operations are conducted, take precautions to prevent electric shock by turning the power switch off, wearing insulated gloves, and removing the service plug grip from HV battery.
- Inspecting the high-voltage system
- Disconnecting the low voltage connector of the inverter with converter assembly and hybrid motor control inverter assembly rear*
- Disconnecting the low voltage connector of the HV battery
- *: for AWD
- To prevent electric shock, make sure to remove the service plug grip to cut off the high voltage circuit before servicing the vehicle.
- After removing the service plug grip from the HV battery, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.
- After removing the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals. After waiting for 10 minutes, check the voltage at the terminals in the inspection point in the inverter with converter assembly. The voltage should be 0 V before beginning work.
Refer to PRECAUTION [10/2018 - ]
Fig 4: Do Not Service Vehicle Without Waiting At Least 10 Minutes To Discharge The High-Voltage CapacitorCourtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
*a Without waiting for 10 minutes HINT:
Waiting for at least 10 minutes is required to discharge the high-voltage capacitor inside the inverter with converter assembly.
NOTE:
After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work.
Refer to INITIALIZATION [10/2018 - 07/2022] Refer to INITIALIZATION [07/2022 - ]